ACCERT Inputs and Explanations

ACCERT

The Algorithm for the Capital Cost Elements of Reactor Technologies (ACCERT) relies on several different references to properly calculate the cost of a nuclear facility.

This stage of ACCERT bases the calculations off of two user inputs:

  • A reference model. (Between the PWR12-BE or the ABR-1000)

  • The theoretical thermal and electrical output of the desired nuclear reactor. (MW)