ABR-1000 Variables
Index |
Name |
Description |
Unit |
|---|---|---|---|
1 |
c_213_fac |
Turbine building structure factory cost |
million |
2 |
c_213_lab |
Turbine building structure labor cost |
million |
3 |
c_213_mat |
Turbine building structure material cost |
million |
4 |
c_220A.2121_ss_weight |
weight of the stainless steel lower internals |
ton |
5 |
c_220A.2122_ss_weight |
weight of the stainless steel upper internals |
ton |
6 |
c_220A.222_ss_weight |
weight of the stainless steel reactor coolant piping |
ton |
7 |
c_222_fac |
Main heat transfer transport system factory cost |
million |
8 |
c_222_lab |
Main heat transfer transport system labor cost |
million |
9 |
c_222_mat |
Main heat transfer transport system material cost |
million |
10 |
c_222.11_fac |
Fluid Circulation Drive System (Field Cost 222) factory cost |
million |
11 |
c_222.11_lab |
Fluid Circulation Drive System (Field Cost 222) labor cost |
million |
12 |
c_222.11_mat |
Fluid Circulation Drive System (Field Cost 222) material cost |
million |
13 |
c_222.12_fac |
Reactor Coolant Piping System (Field Cost 222) factory cost |
million |
14 |
c_222.12_lab |
Reactor Coolant Piping System (Field Cost 222) labor cost |
million |
15 |
c_222.12_mat |
Reactor Coolant Piping System (Field Cost 222) material cost |
million |
16 |
c_222.13_fac |
Steam Generator Equipment (Field Cost 222) factory cost |
million |
17 |
c_222.14_fac |
Pressurizing System (Field Cost 222) factory cost |
million |
18 |
c_222.14_lab |
Pressurizing System (Field Cost 222) labor cost |
million |
19 |
c_222.14_mat |
Pressurizing System (Field Cost 222) material cost |
million |
20 |
c_231_fac |
Turbine factory cost |
million |
21 |
c_231_lab |
Turbine labor cost |
million |
22 |
c_231_mat |
Turbine material cost |
million |
23 |
c_233_fac |
Condensing Systems factory cost |
million |
24 |
c_233_lab |
Condensing Systems labor cost |
million |
25 |
c_233_mat |
Condensing Systems material cost |
million |
26 |
c_241_fac |
Switchgear factory cost |
million |
27 |
c_241_lab |
Switchgear labor cost |
million |
28 |
c_241_mat |
Switchgear material cost |
million |
29 |
c_242_fac |
Station service equipment factory cost |
million |
30 |
c_242_lab |
Station service equipment labor cost |
million |
31 |
c_242_mat |
Station service equipment material cost |
million |
32 |
c_245_fac |
Electric structure and wiring contnr. factory cost |
million |
33 |
c_245_lab |
Electric structure and wiring contnr. labor cost |
million |
34 |
c_245_mat |
Electric structure and wiring contnr. material cost |
million |
35 |
c_246_fac |
Power and control wiring factory cost |
million |
36 |
c_246_lab |
Power and control wiring labor cost |
million |
37 |
c_246_mat |
Power and control wiring material cost |
million |
38 |
c_262_fac |
Heat Rejection System factory cost |
million |
39 |
c_262_lab |
Heat Rejection System labor cost |
million |
40 |
c_262_mat |
Heat Rejection System material cost |
million |
41 |
c_cr_per_unit_fac |
unit cost of rod |
million |
42 |
c_crd_per_unit_fac |
unit cost of rod drive |
million |
43 |
c_pump_ap1000 |
AP1000 factory cost of main coolant pumps |
million |
44 |
c_pump_per_unit_fac |
Reactor coolant pumps Factory Equipment Cost |
million |
45 |
c_turbine |
Turbine equipment cost |
million |
46 |
c_zero |
place holder for weight |
ton |
47 |
CH_abr1000 |
CH factor of PWR-12 BE |
gpm*feet |
48 |
CH_AP1000 |
CH factor of AP1000 |
gpm*feet |
49 |
escalate_1987 |
escalator 1987 to 2017 |
1 |
50 |
mwe |
user_input MWE |
MW |
51 |
mwreth |
rejected thermal power |
MW |
52 |
mwth |
user_input mwth |
MW |
53 |
no_of_cr |
Total control rods |
1 |
54 |
no_of_crd |
Total control rod drives |
1 |
55 |
no_of_rcpump |
total number of reactor coolant pumps |
1 |
56 |
prn_235_of_231_fac |
factory portion of cost from factory of 231 |
1 |
57 |
prn_235_of_231_lab |
labor portion of cost from labor of 231 |
1 |
58 |
prn_235_of_231_mat |
material portion of cost from labor of 231 |
1 |
59 |
prn_fac_231_lab |
labor portion of cost from factory of 231 |
1 |
60 |
prn_fac_231_mat |
material portion of cost from factory of 231 |
1 |
61 |
r_222.13_lab |
labor cost of Steam Generator Equipment (Field Cost 222) |
million |
62 |
r_222.13_mat |
material cost of Steam Generator Equipment (Field Cost 222) |
million |
63 |
r_78_220A224_fac |
factory cost of pressurizer in ref |
million |
64 |
r_78_226.4_fac |
Coolant Treatment & Recycle factory cost |
million |
65 |
ref_211_fac |
yardwork factory cost |
million |
66 |
ref_211_lab |
yardwork labor cost |
million |
67 |
ref_211_mat |
yardwork material cost |
million |
68 |
ref_224_fac |
Radwaste processing factory cost |
million |
69 |
ref_224_lab |
Radwaste processing labor cost |
million |
70 |
ref_224_mat |
Radwaste processing material cost |
million |
71 |
ref_227_fac |
Reactor instrumentation and control factory cost |
million |
72 |
ref_227_lab |
Reactor instrumentation and control labor cost |
million |
73 |
ref_227_mat |
Reactor instrumentation and control material cost |
million |
74 |
ref_252_fac |
Air, water and steam service systems factory cost |
million |
75 |
ref_252_lab |
Air, water and steam service systems labor cost |
million |
76 |
ref_252_mat |
Air, water and steam service systems material cost |
million |
77 |
scale_0.4 |
electric scale 0.4 |
1 |
78 |
scale_0.52 |
SH scale 1.0 |
1 |
79 |
scale_0.8 |
thermal scale 0.8 |
1 |
80 |
scale_1.0 |
thermal scale 1.0 |
1 |
81 |
scale_tur_231_fac |
factory scale of cost from turbine |
1 |
82 |
CPI |
The Consumer Price Index |
1 |
83 |
Void_fraction |
Void fraction of the inside of the containment |
1 |
84 |
liner_fraction |
liner fraction of containment |
1 |
85 |
Cont_H_tot_m |
Containment total height |
m |
86 |
Cont_rad_out_m |
Containment outside radius |
m |
87 |
Cont_shell_t_m |
Shell wall thickness |
m |
88 |
Cont_H_wall_m |
Containment wall height |
m |
89 |
Basemat_t_m |
Basemat thickness |
m |
90 |
Dome_t_m |
Dome thickness |
m |
91 |
Intern_wall_t |
Internal wall average thickness |
m |
92 |
React_cav_A_m2 |
Reactor cavity area |
m^2 |
93 |
Cont_rad_in_m |
Containment inside radius |
m |
94 |
Basemat_s_m2 |
Basemat surface |
m^2 |
95 |
Basemat_v_m3 |
Basemat volume |
m^3 |
96 |
Walls_s_m2 |
Walls surface |
m^2 |
97 |
Walls_v_m3 |
Walls volume |
m^3 |
98 |
Dome_rad_in_m |
Dome inside radius |
m |
99 |
Dome_s_m2 |
Roof surface |
m^2 |
100 |
Dome_v_m3 |
Roof volume |
m^3 |
101 |
Intern_tot_v_m3 |
Tot intenal Volume |
m^3 |
102 |
Internal_v_m3 |
Building internal volume |
m^3 |
103 |
Internal_s_m2 |
Building internal surface |
m^2 |
104 |
Struct_v_m3 |
volume of the structures |
m^3 |
105 |
Inside_liner_s |
Inside liner surface |
m^2 |
106 |
Liner_s_m2 |
Liner Surface |
m^2 |
107 |
Surf_paint_m2 |
painted surface |
m^2 |
108 |
infl |
Inflation rate |
1 |
109 |
Unit_EEDB_Labor_Cadweld_Substr |
Unit cost of Labor Cadweld Substructure (base mat) in EEDB |
dollar/m^3 |
110 |
Unit_EEDB_Labor_Cadweld_Superstr |
Unit cost of Labor Cadweld Superstructure (shell) in EEDB |
dollar/m^3 |
111 |
Unit_EEDB_Labor_Cadweld_Dome |
Unit cost of Labor Cadweld Superstructure (dome) in EEDB |
dollar/m^3 |
112 |
Unit_EEDB_Labor_Cadweld_Interior |
Unit cost of Labor Cadweld Interior structure in EEDB |
dollar/m^3 |
113 |
Unit_EEDB_Labor_Concrete_Substr |
Unit cost of Labor Concrete Substructure (base mat) in EEDB |
dollar/m^3 |
114 |
Unit_EEDB_Labor_Concrete_Superstr |
Unit cost of Labor Concrete Superstructure (shell) in EEDB |
dollar/m^3 |
115 |
Unit_EEDB_Labor_Concrete_Dome |
Unit cost of Labor Concrete Superstructure (dome) in EEDB |
dollar/m^3 |
116 |
Unit_EEDB_Labor_Concrete_Interior |
Unit cost of Labor Concrete Interior structure in EEDB |
dollar/m^3 |
117 |
Unit_EEDB_Labor_Constr_joints_Substr |
Unit cost of Labor Construction joints Substructure (base mat) in EEDB |
dollar/m^2 |
118 |
Unit_EEDB_Labor_Constr_joints_Superstr |
Unit cost of Labor Construction joints Superstructure (shell) in EEDB |
dollar/m^2 |
119 |
Unit_EEDB_Labor_Constr_joints_Dome |
Unit cost of Labor Construction joints Superstructure (dome) in EEDB |
dollar/m^2 |
120 |
Unit_EEDB_Labor_Constr_joints_Interior |
Unit cost of Labor Construction joints Interior structure in EEDB |
dollar/m^2 |
121 |
Unit_EEDB_Labor_Embedded_steel_Substr |
Unit cost of Labor Embedded steel Substructure (base mat) in EEDB |
dollar/m^3 |
122 |
Unit_EEDB_Labor_Embedded_steel_Superstr |
Unit cost of Labor Embedded steel Superstructure (shell) in EEDB |
dollar/m^3 |
123 |
Unit_EEDB_Labor_Embedded_steel_Dome |
Unit cost of Labor Embedded steel Superstructure (dome) in EEDB |
dollar/m^3 |
124 |
Unit_EEDB_Labor_Embedded_steel_Interior |
Unit cost of Labor Embedded steel Interior structure in EEDB |
dollar/m^3 |
125 |
Unit_EEDB_Labor_Formwork_Substr |
Unit cost of Labor Formwork Substructure (base mat) in EEDB |
dollar/m^2 |
126 |
Unit_EEDB_Labor_Formwork_Superstr |
Unit cost of Labor Formwork Superstructure (shell) in EEDB |
dollar/m^2 |
127 |
Unit_EEDB_Labor_Formwork_Dome |
Unit cost of Labor Formwork Superstructure (dome) in EEDB |
dollar/m^2 |
128 |
Unit_EEDB_Labor_Formwork_Interior |
Unit cost of Labor Formwork Interior structure in EEDB |
dollar/m^2 |
129 |
Unit_EEDB_Labor_Maj_supp_embedments_Interior |
Unit cost of Labor Major Support Embedments Interior structure in EEDB |
dollar/m^3 |
130 |
Unit_EEDB_Labor_Reinforc_steel_Substr |
Unit cost of Labor Reinforc steel Substructure (base mat) in EEDB |
dollar/m^3 |
131 |
Unit_EEDB_Labor_Reinforc_steel_Superstr |
Unit cost of Labor Reinforc steel Superstructure (shell) in EEDB |
dollar/m^3 |
132 |
Unit_EEDB_Labor_Reinforc_steel_Dome |
Unit cost of Labor Reinforc steel Superstructure (dome) in EEDB |
dollar/m^3 |
133 |
Unit_EEDB_Labor_Reinforc_steel_Interior |
Unit cost of Labor Reinforc steel Interior structure in EEDB |
dollar/m^3 |
134 |
Unit_EEDB_Labor_Rubbing_surfaces_Superstr |
Unit cost of Labor Rubbing surfaces Superstructure (shell) in EEDB |
dollar/m^2 |
135 |
Unit_EEDB_Labor_Rubbing_surfaces_Dome |
Unit cost of Labor Rubbing surfaces Superstructure (dome) in EEDB |
dollar/m^2 |
136 |
Unit_EEDB_Labor_Rubbing_surfaces_Interior |
Unit cost of Labor Rubbing surfaces Interior structure in EEDB |
dollar/m^2 |
137 |
Unit_EEDB_Labor_Waterproofing_Substr |
Unit cost of Labor Waterproofing Substructure (base mat) in EEDB |
dollar/m^2 |
138 |
Unit_EEDB_Labor_Waterproofing_Superstr |
Unit cost of Labor Waterproofing Superstructure (shell) in EEDB |
dollar/m^2 |
139 |
Unit_EEDB_Labor_Waterproofing_Dome |
Unit cost of Labor Waterproofing Superstructure (dome) in EEDB |
dollar/m^2 |
140 |
Unit_EEDB_Labor_Welded_wire_fabric_Substr |
Unit cost of Labor Welded wire fabric Substructure (base mat) in EEDB |
dollar/m^2 |
141 |
Unit_EEDB_Labor_Lighting_Power |
Unit cost of Labor Lighting Power in EEDB |
dollar/m^3 |
142 |
Unit_EEDB_Labor_Plumb_drains |
Unit cost of Labor Plumb drains in EEDB |
dollar/m^3 |
143 |
Unit_EEDB_Labor_Special_HVAC |
Unit cost of Labor Special HVAC in EEDB |
dollar/m^3 |
144 |
Unit_EEDB_Labor_other |
Unit cost of Labor other in EEDB |
dollar/m^3 |
145 |
Unit_EEDB_Labor_Misc_steel_frames |
Unit cost of Labor miscellaneous steel frames in EEDB |
dollar/m^3 |
146 |
Unit_EEDB_Labor_React_cav_liner |
Unit cost of Labor Reactor cavity liner plate in EEDB |
dollar/m^2 |
147 |
Unit_EEDB_Labor_Struct_steel |
Unit cost of Labor Struct steel in EEDB |
dollar/m^3 |
148 |
Unit_EEDB_Labor_cont_liner |
Unit cost of Labor Containment liner in EEDB |
dollar/m^2 |
149 |
Unit_EEDB_Labor_fl_grate_handrail_stairs |
Unit cost of Labor Floor grating (galvanized), Handrail, Stair treads in EEDB |
dollar/m^3 |
150 |
Unit_EEDB_Labor_painting |
Unit cost of Labor painting in EEDB |
dollar/m^2 |
151 |
Unit_EEDB_Mat_Cadweld_Substr |
Unit cost of Material Cadweld Substructure (base mat) in EEDB |
dollar/m^3 |
152 |
Unit_EEDB_Mat_Cadweld_Superstr |
Unit cost of Material Cadweld Superstructure (shell) in EEDB |
dollar/m^3 |
153 |
Unit_EEDB_Mat_Cadweld_Dome |
Unit cost of Material Cadweld Superstructure (dome) in EEDB |
dollar/m^3 |
154 |
Unit_EEDB_Mat_Cadweld_Interior |
Unit cost of Material Cadweld Interior structure in EEDB |
dollar/m^3 |
155 |
Unit_EEDB_Mat_Concrete_Substr |
Unit cost of Material Concrete Substructure (base mat) in EEDB |
dollar/m^3 |
156 |
Unit_EEDB_Mat_Concrete_Superstr |
Unit cost of Material Concrete Superstructure (shell) in EEDB |
dollar/m^3 |
157 |
Unit_EEDB_Mat_Concrete_Dome |
Unit cost of Material Concrete Superstructure (dome) in EEDB |
dollar/m^3 |
158 |
Unit_EEDB_Mat_Concrete_Interior |
Unit cost of Material Concrete Interior structure in EEDB |
dollar/m^3 |
159 |
Unit_EEDB_Mat_Constr_joints_Substr |
Unit cost of Material Construction joints Substructure (base mat) in EEDB |
dollar/m^2 |
160 |
Unit_EEDB_Mat_Constr_joints_Superstr |
Unit cost of Material Construction joints Superstructure (shell) in EEDB |
dollar/m^2 |
161 |
Unit_EEDB_Mat_Constr_joints_Dome |
Unit cost of Material Construction joints Superstructure (dome) in EEDB |
dollar/m^2 |
162 |
Unit_EEDB_Mat_Constr_joints_Interior |
Unit cost of Material Construction joints Interior structure in EEDB |
dollar/m^2 |
163 |
Unit_EEDB_Mat_Embedded_steel_Substr |
Unit cost of Material Embedded steel Substructure (base mat) in EEDB |
dollar/m^3 |
164 |
Unit_EEDB_Mat_Embedded_steel_Superstr |
Unit cost of Material Embedded steel Superstructure (shell) in EEDB |
dollar/m^3 |
165 |
Unit_EEDB_Mat_Embedded_steel_Dome |
Unit cost of Material Embedded steel Superstructure (dome) in EEDB |
dollar/m^3 |
166 |
Unit_EEDB_Mat_Embedded_steel_Interior |
Unit cost of Material Embedded steel Interior structure in EEDB |
dollar/m^3 |
167 |
Unit_EEDB_Mat_Formwork_Substr |
Unit cost of Material Formwork Substructure (base mat) in EEDB |
dollar/m^2 |
168 |
Unit_EEDB_Mat_Formwork_Superstr |
Unit cost of Material Formwork Superstructure (shell) in EEDB |
dollar/m^2 |
169 |
Unit_EEDB_Mat_Formwork_Dome |
Unit cost of Material Formwork Superstructure (dome) in EEDB |
dollar/m^2 |
170 |
Unit_EEDB_Mat_Formwork_Interior |
Unit cost of Material Formwork Interior structure in EEDB |
dollar/m^2 |
171 |
Unit_EEDB_Mat_Maj_supp_embedments_Interior |
Unit cost of Material Major Support Embedments Interior structure in EEDB |
dollar/m^3 |
172 |
Unit_EEDB_Mat_Reinforc_steel_Substr |
Unit cost of Material Reinforc steel Substructure (base mat) in EEDB |
dollar/m^3 |
173 |
Unit_EEDB_Mat_Reinforc_steel_Superstr |
Unit cost of Material Reinforc steel Superstructure (shell) in EEDB |
dollar/m^3 |
174 |
Unit_EEDB_Mat_Reinforc_steel_Dome |
Unit cost of Material Reinforc steel Superstructure (dome) in EEDB |
dollar/m^3 |
175 |
Unit_EEDB_Mat_Reinforc_steel_Interior |
Unit cost of Material Reinforc steel Interior structure in EEDB |
dollar/m^3 |
176 |
Unit_EEDB_Mat_Rubbing_surfaces_Superstr |
Unit cost of Material Rubbing surfaces Superstructure (shell) in EEDB |
dollar/m^2 |
177 |
Unit_EEDB_Mat_Rubbing_surfaces_Dome |
Unit cost of Material Rubbing surfaces Superstructure (dome) in EEDB |
dollar/m^2 |
178 |
Unit_EEDB_Mat_Rubbing_surfaces_Interior |
Unit cost of Material Rubbing surfaces Interior structure in EEDB |
dollar/m^2 |
179 |
Unit_EEDB_Mat_Waterproofing_Substr |
Unit cost of Material Waterproofing Substructure (base mat) in EEDB |
dollar/m^2 |
180 |
Unit_EEDB_Mat_Waterproofing_Superstr |
Unit cost of Material Waterproofing Superstructure (shell) in EEDB |
dollar/m^2 |
181 |
Unit_EEDB_Mat_Waterproofing_Dome |
Unit cost of Material Waterproofing Superstructure (dome) in EEDB |
dollar/m^2 |
182 |
Unit_EEDB_Mat_Welded_wire_fabric_Substr |
Unit cost of Material Welded wire fabric Substructure (base mat) in EEDB |
dollar/m^2 |
183 |
Unit_EEDB_Mat_Lighting_Power |
Unit cost of Material Lighting Power in EEDB |
dollar/m^3 |
184 |
Unit_EEDB_Mat_Plumb_drains |
Unit cost of Material Plumb drains in EEDB |
dollar/m^3 |
185 |
Unit_EEDB_Mat_Special_HVAC |
Unit cost of Material Special HVAC in EEDB |
dollar/m^3 |
186 |
Unit_EEDB_Mat_other |
Unit cost of Material other in EEDB |
dollar/m^3 |
187 |
Unit_EEDB_Mat_Misc_steel_frames |
Unit cost of Material miscellaneous steel frames in EEDB |
dollar/m^3 |
188 |
Unit_EEDB_Mat_React_cav_liner |
Unit cost of Material Reactor cavity liner plate in EEDB |
dollar/m^2 |
189 |
Unit_EEDB_Mat_Struct_steel |
Unit cost of Material Struct steel in EEDB |
dollar/m^3 |
190 |
Unit_EEDB_Mat_cont_liner |
Unit cost of Material Containment liner in EEDB |
dollar/m^2 |
191 |
Unit_EEDB_Mat_fl_grate_handrail_stairs |
Unit cost of Material Floor grating (galvanized), Handrail, Stair treads in EEDB |
dollar/m^3 |
192 |
Unit_EEDB_Mat_painting |
Unit cost of Material painting in EEDB |
dollar/m^2 |
193 |
Unit_Labor_Cadweld_Substr |
Unit cost of Labor Cadweld Substructure (base mat) in 2017 |
dollar/m^3 |
194 |
Unit_Labor_Cadweld_Superstr |
Unit cost of Labor Cadweld Superstructure (shell) in 2017 |
dollar/m^3 |
195 |
Unit_Labor_Cadweld_Dome |
Unit cost of Labor Cadweld Superstructure (dome) in 2017 |
dollar/m^3 |
196 |
Unit_Labor_Cadweld_Interior |
Unit cost of Labor Cadweld Interior structure in 2017 |
dollar/m^3 |
197 |
Unit_Labor_Concrete_Substr |
Unit cost of Labor Concrete Substructure (base mat) in 2017 |
dollar/m^3 |
198 |
Unit_Labor_Concrete_Superstr |
Unit cost of Labor Concrete Superstructure (shell) in 2017 |
dollar/m^3 |
199 |
Unit_Labor_Concrete_Dome |
Unit cost of Labor Concrete Superstructure (dome) in 2017 |
dollar/m^3 |
200 |
Unit_Labor_Concrete_Interior |
Unit cost of Labor Concrete Interior structure in 2017 |
dollar/m^3 |
201 |
Unit_Labor_Constr_joints_Substr |
Unit cost of Labor Construction joints Substructure (base mat) in 2017 |
dollar/m^2 |
202 |
Unit_Labor_Constr_joints_Superstr |
Unit cost of Labor Construction joints Superstructure (shell) in 2017 |
dollar/m^2 |
203 |
Unit_Labor_Constr_joints_Dome |
Unit cost of Labor Construction joints Superstructure (dome) in 2017 |
dollar/m^2 |
204 |
Unit_Labor_Constr_joints_Interior |
Unit cost of Labor Construction joints Interior structure in 2017 |
dollar/m^2 |
205 |
Unit_Labor_Embedded_steel_Substr |
Unit cost of Labor Embedded steel Substructure (base mat) in 2017 |
dollar/m^3 |
206 |
Unit_Labor_Embedded_steel_Superstr |
Unit cost of Labor Embedded steel Superstructure (shell) in 2017 |
dollar/m^3 |
207 |
Unit_Labor_Embedded_steel_Dome |
Unit cost of Labor Embedded steel Superstructure (dome) in 2017 |
dollar/m^3 |
208 |
Unit_Labor_Embedded_steel_Interior |
Unit cost of Labor Embedded steel Interior structure in 2017 |
dollar/m^3 |
209 |
Unit_Labor_Formwork_Substr |
Unit cost of Labor Formwork Substructure (base mat) in 2017 |
dollar/m^2 |
210 |
Unit_Labor_Formwork_Superstr |
Unit cost of Labor Formwork Superstructure (shell) in 2017 |
dollar/m^2 |
211 |
Unit_Labor_Formwork_Dome |
Unit cost of Labor Formwork Superstructure (dome) in 2017 |
dollar/m^2 |
212 |
Unit_Labor_Formwork_Interior |
Unit cost of Labor Formwork Interior structure in 2017 |
dollar/m^2 |
213 |
Unit_Labor_Maj_supp_embedments_Interior |
Unit cost of Labor Major Support Embedments Interior structure in 2017 |
dollar/m^3 |
214 |
Unit_Labor_Reinforc_steel_Substr |
Unit cost of Labor Reinforc steel Substructure (base mat) in 2017 |
dollar/m^3 |
215 |
Unit_Labor_Reinforc_steel_Superstr |
Unit cost of Labor Reinforc steel Superstructure (shell) in 2017 |
dollar/m^3 |
216 |
Unit_Labor_Reinforc_steel_Dome |
Unit cost of Labor Reinforc steel Superstructure (dome) in 2017 |
dollar/m^3 |
217 |
Unit_Labor_Reinforc_steel_Interior |
Unit cost of Labor Reinforc steel Interior structure in 2017 |
dollar/m^3 |
218 |
Unit_Labor_Rubbing_surfaces_Superstr |
Unit cost of Labor Rubbing surfaces Superstructure (shell) in 2017 |
dollar/m^2 |
219 |
Unit_Labor_Rubbing_surfaces_Dome |
Unit cost of Labor Rubbing surfaces Superstructure (dome) in 2017 |
dollar/m^2 |
220 |
Unit_Labor_Rubbing_surfaces_Interior |
Unit cost of Labor Rubbing surfaces Interior structure in 2017 |
dollar/m^2 |
221 |
Unit_Labor_Waterproofing_Substr |
Unit cost of Labor Waterproofing Substructure (base mat) in 2017 |
dollar/m^2 |
222 |
Unit_Labor_Waterproofing_Superstr |
Unit cost of Labor Waterproofing Superstructure (shell) in 2017 |
dollar/m^2 |
223 |
Unit_Labor_Waterproofing_Dome |
Unit cost of Labor Waterproofing Superstructure (dome) in 2017 |
dollar/m^2 |
224 |
Unit_Labor_Welded_wire_fabric_Substr |
Unit cost of Labor Welded wire fabric Substructure (base mat) in 2017 |
dollar/m^2 |
225 |
Unit_Labor_Lighting_Power |
Unit cost of Labor Lighting Power in 2017 |
dollar/m^3 |
226 |
Unit_Labor_Plumb_drains |
Unit cost of Labor Plumb drains in 2017 |
dollar/m^3 |
227 |
Unit_Labor_Special_HVAC |
Unit cost of Labor Special HVAC in 2017 |
dollar/m^3 |
228 |
Unit_Labor_other |
Unit cost of Labor other in 2017 |
dollar/m^3 |
229 |
Unit_Labor_Misc_steel_frames |
Unit cost of Labor miscellaneous steel frames in 2017 |
dollar/m^3 |
230 |
Unit_Labor_React_cav_liner |
Unit cost of Labor Reactor cavity liner plate in 2017 |
dollar/m^2 |
231 |
Unit_Labor_Struct_steel |
Unit cost of Labor Struct steel in 2017 |
dollar/m^3 |
232 |
Unit_Labor_cont_liner |
Unit cost of Labor Containment liner in 2017 |
dollar/m^2 |
233 |
Unit_Labor_fl_grate_handrail_stairs |
Unit cost of Labor Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar/m^3 |
234 |
Unit_Labor_painting |
Unit cost of Labor painting in 2017 |
dollar/m^2 |
235 |
Unit_Mat_Cadweld_Substr |
Unit cost of Material Cadweld Substructure (base mat) in 2017 |
dollar/m^3 |
236 |
Unit_Mat_Cadweld_Superstr |
Unit cost of Material Cadweld Superstructure (shell) in 2017 |
dollar/m^3 |
237 |
Unit_Mat_Cadweld_Dome |
Unit cost of Material Cadweld Superstructure (dome) in 2017 |
dollar/m^3 |
238 |
Unit_Mat_Cadweld_Interior |
Unit cost of Material Cadweld Interior structure in 2017 |
dollar/m^3 |
239 |
Unit_Mat_Concrete_Substr |
Unit cost of Material Concrete Substructure (base mat) in 2017 |
dollar/m^3 |
240 |
Unit_Mat_Concrete_Superstr |
Unit cost of Material Concrete Superstructure (shell) in 2017 |
dollar/m^3 |
241 |
Unit_Mat_Concrete_Dome |
Unit cost of Material Concrete Superstructure (dome) in 2017 |
dollar/m^3 |
242 |
Unit_Mat_Concrete_Interior |
Unit cost of Material Concrete Interior structure in 2017 |
dollar/m^3 |
243 |
Unit_Mat_Constr_joints_Substr |
Unit cost of Material Construction joints Substructure (base mat) in 2017 |
dollar/m^2 |
244 |
Unit_Mat_Constr_joints_Superstr |
Unit cost of Material Construction joints Superstructure (shell) in 2017 |
dollar/m^2 |
245 |
Unit_Mat_Constr_joints_Dome |
Unit cost of Material Construction joints Superstructure (dome) in 2017 |
dollar/m^2 |
246 |
Unit_Mat_Constr_joints_Interior |
Unit cost of Material Construction joints Interior structure in 2017 |
dollar/m^2 |
247 |
Unit_Mat_Embedded_steel_Substr |
Unit cost of Material Embedded steel Substructure (base mat) in 2017 |
dollar/m^3 |
248 |
Unit_Mat_Embedded_steel_Superstr |
Unit cost of Material Embedded steel Superstructure (shell) in 2017 |
dollar/m^3 |
249 |
Unit_Mat_Embedded_steel_Dome |
Unit cost of Material Embedded steel Superstructure (dome) in 2017 |
dollar/m^3 |
250 |
Unit_Mat_Embedded_steel_Interior |
Unit cost of Material Embedded steel Interior structure in 2017 |
dollar/m^3 |
251 |
Unit_Mat_Formwork_Substr |
Unit cost of Material Formwork Substructure (base mat) in 2017 |
dollar/m^2 |
252 |
Unit_Mat_Formwork_Superstr |
Unit cost of Material Formwork Superstructure (shell) in 2017 |
dollar/m^2 |
253 |
Unit_Mat_Formwork_Dome |
Unit cost of Material Formwork Superstructure (dome) in 2017 |
dollar/m^2 |
254 |
Unit_Mat_Formwork_Interior |
Unit cost of Material Formwork Interior structure in 2017 |
dollar/m^2 |
255 |
Unit_Mat_Maj_supp_embedments_Interior |
Unit cost of Material Major Support Embedments Interior structure in 2017 |
dollar/m^3 |
256 |
Unit_Mat_Reinforc_steel_Substr |
Unit cost of Material Reinforc steel Substructure (base mat) in 2017 |
dollar/m^3 |
257 |
Unit_Mat_Reinforc_steel_Superstr |
Unit cost of Material Reinforc steel Superstructure (shell) in 2017 |
dollar/m^3 |
258 |
Unit_Mat_Reinforc_steel_Dome |
Unit cost of Material Reinforc steel Superstructure (dome) in 2017 |
dollar/m^3 |
259 |
Unit_Mat_Reinforc_steel_Interior |
Unit cost of Material Reinforc steel Interior structure in 2017 |
dollar/m^3 |
260 |
Unit_Mat_Rubbing_surfaces_Superstr |
Unit cost of Material Rubbing surfaces Superstructure (shell) in 2017 |
dollar/m^2 |
261 |
Unit_Mat_Rubbing_surfaces_Dome |
Unit cost of Material Rubbing surfaces Superstructure (dome) in 2017 |
dollar/m^2 |
262 |
Unit_Mat_Rubbing_surfaces_Interior |
Unit cost of Material Rubbing surfaces Interior structure in 2017 |
dollar/m^2 |
263 |
Unit_Mat_Waterproofing_Substr |
Unit cost of Material Waterproofing Substructure (base mat) in 2017 |
dollar/m^2 |
264 |
Unit_Mat_Waterproofing_Superstr |
Unit cost of Material Waterproofing Superstructure (shell) in 2017 |
dollar/m^2 |
265 |
Unit_Mat_Waterproofing_Dome |
Unit cost of Material Waterproofing Superstructure (dome) in 2017 |
dollar/m^2 |
266 |
Unit_Mat_Welded_wire_fabric_Substr |
Unit cost of Material Welded wire fabric Substructure (base mat) in 2017 |
dollar/m^2 |
267 |
Unit_Mat_Lighting_Power |
Unit cost of Material Lighting Power in 2017 |
dollar/m^3 |
268 |
Unit_Mat_Plumb_drains |
Unit cost of Material Plumb drains in 2017 |
dollar/m^3 |
269 |
Unit_Mat_Special_HVAC |
Unit cost of Material Special HVAC in 2017 |
dollar/m^3 |
270 |
Unit_Mat_other |
Unit cost of Material other in 2017 |
dollar/m^3 |
271 |
Unit_Mat_Misc_steel_frames |
Unit cost of Material miscellaneous steel frames in 2017 |
dollar/m^3 |
272 |
Unit_Mat_React_cav_liner |
Unit cost of Material Reactor cavity liner plate in 2017 |
dollar/m^2 |
273 |
Unit_Mat_Struct_steel |
Unit cost of Material Struct steel in 2017 |
dollar/m^3 |
274 |
Unit_Mat_cont_liner |
Unit cost of Material Containment liner in 2017 |
dollar/m^2 |
275 |
Unit_Mat_fl_grate_handrail_stairs |
Unit cost of Material Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar/m^3 |
276 |
Unit_Mat_painting |
Unit cost of Material painting in 2017 |
dollar/m^2 |
277 |
Total_Labor_Cadweld_Substr |
Total cost of Labor Cadweld Substructure (base mat) in 2017 |
dollar |
278 |
Total_Labor_Cadweld_Superstr |
Total cost of Labor Cadweld Superstructure (shell) in 2017 |
dollar |
279 |
Total_Labor_Cadweld_Dome |
Total cost of Labor Cadweld Superstructure (dome) in 2017 |
dollar |
280 |
Total_Labor_Cadweld_Interior |
Total cost of Labor Cadweld Interior structure in 2017 |
dollar |
281 |
Total_Labor_Concrete_Substr |
Total cost of Labor Concrete Substructure (base mat) in 2017 |
dollar |
282 |
Total_Labor_Concrete_Superstr |
Total cost of Labor Concrete Superstructure (shell) in 2017 |
dollar |
283 |
Total_Labor_Concrete_Dome |
Total cost of Labor Concrete Superstructure (dome) in 2017 |
dollar |
284 |
Total_Labor_Concrete_Interior |
Total cost of Labor Concrete Interior structure in 2017 |
dollar |
285 |
Total_Labor_Constr_joints_Substr |
Total cost of Labor Construction joints Substructure (base mat) in 2017 |
dollar |
286 |
Total_Labor_Constr_joints_Superstr |
Total cost of Labor Construction joints Superstructure (shell) in 2017 |
dollar |
287 |
Total_Labor_Constr_joints_Dome |
Total cost of Labor Construction joints Superstructure (dome) in 2017 |
dollar |
288 |
Total_Labor_Constr_joints_Interior |
Total cost of Labor Construction joints Interior structure in 2017 |
dollar |
289 |
Total_Labor_Embedded_steel_Substr |
Total cost of Labor Embedded steel Substructure (base mat) in 2017 |
dollar |
290 |
Total_Labor_Embedded_steel_Superstr |
Total cost of Labor Embedded steel Superstructure (shell) in 2017 |
dollar |
291 |
Total_Labor_Embedded_steel_Dome |
Total cost of Labor Embedded steel Superstructure (dome) in 2017 |
dollar |
292 |
Total_Labor_Embedded_steel_Interior |
Total cost of Labor Embedded steel Interior structure in 2017 |
dollar |
293 |
Total_Labor_Formwork_Substr |
Total cost of Labor Formwork Substructure (base mat) in 2017 |
dollar |
294 |
Total_Labor_Formwork_Superstr |
Total cost of Labor Formwork Superstructure (shell) in 2017 |
dollar |
295 |
Total_Labor_Formwork_Dome |
Total cost of Labor Formwork Superstructure (dome) in 2017 |
dollar |
296 |
Total_Labor_Formwork_Interior |
Total cost of Labor Formwork Interior structure in 2017 |
dollar |
297 |
Total_Labor_Maj_supp_embedments_Interior |
Total cost of Labor Major Support Embedments Interior structure in 2017 |
dollar |
298 |
Total_Labor_Reinforc_steel_Substr |
Total cost of Labor Reinforc steel Substructure (base mat) in 2017 |
dollar |
299 |
Total_Labor_Reinforc_steel_Superstr |
Total cost of Labor Reinforc steel Superstructure (shell) in 2017 |
dollar |
300 |
Total_Labor_Reinforc_steel_Dome |
Total cost of Labor Reinforc steel Superstructure (dome) in 2017 |
dollar |
301 |
Total_Labor_Reinforc_steel_Interior |
Total cost of Labor Reinforc steel Interior structure in 2017 |
dollar |
302 |
Total_Labor_Rubbing_surfaces_Superstr |
Total cost of Labor Rubbing surfaces Superstructure (shell) in 2017 |
dollar |
303 |
Total_Labor_Rubbing_surfaces_Dome |
Total cost of Labor Rubbing surfaces Superstructure (dome) in 2017 |
dollar |
304 |
Total_Labor_Rubbing_surfaces_Interior |
Total cost of Labor Rubbing surfaces Interior structure in 2017 |
dollar |
305 |
Total_Labor_Waterproofing_Substr |
Total cost of Labor Waterproofing Substructure (base mat) in 2017 |
dollar |
306 |
Total_Labor_Waterproofing_Superstr |
Total cost of Labor Waterproofing Superstructure (shell) in 2017 |
dollar |
307 |
Total_Labor_Waterproofing_Dome |
Total cost of Labor Waterproofing Superstructure (dome) in 2017 |
dollar |
308 |
Total_Labor_Welded_wire_fabric_Substr |
Total cost of Labor Welded wire fabric Substructure (base mat) in 2017 |
dollar |
309 |
Total_Labor_Lighting_Power |
Total cost of Labor Lighting Power in 2017 |
dollar |
310 |
Total_Labor_Plumb_drains |
Total cost of Labor Plumb drains in 2017 |
dollar |
311 |
Total_Labor_Special_HVAC |
Total cost of Labor Special HVAC in 2017 |
dollar |
312 |
Total_Labor_other |
Total cost of Labor other in 2017 |
dollar |
313 |
Total_Labor_Misc_steel_frames |
Total cost of Labor miscellaneous steel frames in 2017 |
dollar |
314 |
Total_Labor_React_cav_liner |
Total cost of Labor Reactor cavity liner plate in 2017 |
dollar |
315 |
Total_Labor_Struct_steel |
Total cost of Labor Struct steel in 2017 |
dollar |
316 |
Total_Labor_cont_liner |
Total cost of Labor Containment liner in 2017 |
dollar |
317 |
Total_Labor_fl_grate_handrail_stairs |
Total cost of Labor Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar |
318 |
Total_Labor_painting |
Total cost of Labor painting in 2017 |
dollar |
319 |
Total_Mat_Cadweld_Substr |
Total cost of Material Cadweld Substructure (base mat) in 2017 |
dollar |
320 |
Total_Mat_Cadweld_Superstr |
Total cost of Material Cadweld Superstructure (shell) in 2017 |
dollar |
321 |
Total_Mat_Cadweld_Dome |
Total cost of Material Cadweld Superstructure (dome) in 2017 |
dollar |
322 |
Total_Mat_Cadweld_Interior |
Total cost of Material Cadweld Interior structure in 2017 |
dollar |
323 |
Total_Mat_Concrete_Substr |
Total cost of Material Concrete Substructure (base mat) in 2017 |
dollar |
324 |
Total_Mat_Concrete_Superstr |
Total cost of Material Concrete Superstructure (shell) in 2017 |
dollar |
325 |
Total_Mat_Concrete_Dome |
Total cost of Material Concrete Superstructure (dome) in 2017 |
dollar |
326 |
Total_Mat_Concrete_Interior |
Total cost of Material Concrete Interior structure in 2017 |
dollar |
327 |
Total_Mat_Constr_joints_Substr |
Total cost of Material Construction joints Substructure (base mat) in 2017 |
dollar |
328 |
Total_Mat_Constr_joints_Superstr |
Total cost of Material Construction joints Superstructure (shell) in 2017 |
dollar |
329 |
Total_Mat_Constr_joints_Dome |
Total cost of Material Construction joints Superstructure (dome) in 2017 |
dollar |
330 |
Total_Mat_Constr_joints_Interior |
Total cost of Material Construction joints Interior structure in 2017 |
dollar |
331 |
Total_Mat_Embedded_steel_Substr |
Total cost of Material Embedded steel Substructure (base mat) in 2017 |
dollar |
332 |
Total_Mat_Embedded_steel_Superstr |
Total cost of Material Embedded steel Superstructure (shell) in 2017 |
dollar |
333 |
Total_Mat_Embedded_steel_Dome |
Total cost of Material Embedded steel Superstructure (dome) in 2017 |
dollar |
334 |
Total_Mat_Embedded_steel_Interior |
Total cost of Material Embedded steel Interior structure in 2017 |
dollar |
335 |
Total_Mat_Formwork_Substr |
Total cost of Material Formwork Substructure (base mat) in 2017 |
dollar |
336 |
Total_Mat_Formwork_Superstr |
Total cost of Material Formwork Superstructure (shell) in 2017 |
dollar |
337 |
Total_Mat_Formwork_Dome |
Total cost of Material Formwork Superstructure (dome) in 2017 |
dollar |
338 |
Total_Mat_Formwork_Interior |
Total cost of Material Formwork Interior structure in 2017 |
dollar |
339 |
Total_Mat_Maj_supp_embedments_Interior |
Total cost of Material Major Support Embedments Interior structure in 2017 |
dollar |
340 |
Total_Mat_Reinforc_steel_Substr |
Total cost of Material Reinforc steel Substructure (base mat) in 2017 |
dollar |
341 |
Total_Mat_Reinforc_steel_Superstr |
Total cost of Material Reinforc steel Superstructure (shell) in 2017 |
dollar |
342 |
Total_Mat_Reinforc_steel_Dome |
Total cost of Material Reinforc steel Superstructure (dome) in 2017 |
dollar |
343 |
Total_Mat_Reinforc_steel_Interior |
Total cost of Material Reinforc steel Interior structure in 2017 |
dollar |
344 |
Total_Mat_Rubbing_surfaces_Superstr |
Total cost of Material Rubbing surfaces Superstructure (shell) in 2017 |
dollar |
345 |
Total_Mat_Rubbing_surfaces_Dome |
Total cost of Material Rubbing surfaces Superstructure (dome) in 2017 |
dollar |
346 |
Total_Mat_Rubbing_surfaces_Interior |
Total cost of Material Rubbing surfaces Interior structure in 2017 |
dollar |
347 |
Total_Mat_Waterproofing_Substr |
Total cost of Material Waterproofing Substructure (base mat) in 2017 |
dollar |
348 |
Total_Mat_Waterproofing_Superstr |
Total cost of Material Waterproofing Superstructure (shell) in 2017 |
dollar |
349 |
Total_Mat_Waterproofing_Dome |
Total cost of Material Waterproofing Superstructure (dome) in 2017 |
dollar |
350 |
Total_Mat_Welded_wire_fabric_Substr |
Total cost of Material Welded wire fabric Substructure (base mat) in 2017 |
dollar |
351 |
Total_Mat_Lighting_Power |
Total cost of Material Lighting Power in 2017 |
dollar |
352 |
Total_Mat_Plumb_drains |
Total cost of Material Plumb drains in 2017 |
dollar |
353 |
Total_Mat_Special_HVAC |
Total cost of Material Special HVAC in 2017 |
dollar |
354 |
Total_Mat_other |
Total cost of Material other in 2017 |
dollar |
355 |
Total_Mat_Misc_steel_frames |
Total cost of Material miscellaneous steel frames in 2017 |
dollar |
356 |
Total_Mat_React_cav_liner |
Total cost of Material Reactor cavity liner plate in 2017 |
dollar |
357 |
Total_Mat_Struct_steel |
Total cost of Material Struct steel in 2017 |
dollar |
358 |
Total_Mat_cont_liner |
Total cost of Material Containment liner in 2017 |
dollar |
359 |
Total_Mat_fl_grate_handrail_stairs |
Total cost of Material Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar |
360 |
Total_Mat_painting |
Total cost of Material painting in 2017 |
dollar |
361 |
Sum_Labor_Cadweld |
Total cost of Labor Cadweld |
dollar |
362 |
Sum_Labor_Concrete |
Total cost of Labor Concrete |
dollar |
363 |
Sum_Labor_Constr_joints |
Total cost of Labor Constr joints |
dollar |
364 |
Sum_Labor_Embedded_steel |
Total cost of Labor Embedded steel |
dollar |
365 |
Sum_Labor_Formwork |
Total cost of Labor Formwork |
dollar |
366 |
Sum_Labor_Maj_supp_embedments |
Total cost of Labor Maj supp embedments |
dollar |
367 |
Sum_Labor_Reinforc_steel |
Total cost of Labor Reinforc steel |
dollar |
368 |
Sum_Labor_Rubbing_surfaces |
Total cost of Labor Rubbing surfaces |
dollar |
369 |
Sum_Labor_Waterproofing |
Total cost of Labor Waterproofing |
dollar |
370 |
Sum_Labor_Welded_wire_fabric |
Total cost of Labor Welded wire fabric |
dollar |
371 |
Sum_Mat_Cadweld |
Total cost of Material Cadweld |
dollar |
372 |
Sum_Mat_Concrete |
Total cost of Material Concrete |
dollar |
373 |
Sum_Mat_Constr_joints |
Total cost of Material Constr joints |
dollar |
374 |
Sum_Mat_Embedded_steel |
Total cost of Material Embedded steel |
dollar |
375 |
Sum_Mat_Formwork |
Total cost of Material Formwork |
dollar |
376 |
Sum_Mat_Maj_supp_embedments |
Total cost of Material Maj supp embedments |
dollar |
377 |
Sum_Mat_Reinforc_steel |
Total cost of Material Reinforc steel |
dollar |
378 |
Sum_Mat_Rubbing_surfaces |
Total cost of Material Rubbing surfaces |
dollar |
379 |
Sum_Mat_Waterproofing |
Total cost of Material Waterproofing |
dollar |
380 |
Sum_Mat_Welded_wire_fabric |
Total cost of Material Welded wire fabric |
dollar |
381 |
Tot_Labor_concr |
Total cost of labor of containment construction |
dollar |
382 |
Tot_Labor_equipment |
Total cost of labor of containment equipments |
dollar |
383 |
Tot_Labor_others |
Total cost of labor of other non-concrete related items |
dollar |
384 |
Tot_Mat_concr |
Total cost of material of containment construction |
dollar |
385 |
Tot_Mat_equipment |
Total cost of material of containment equipments |
dollar |
386 |
Tot_Mat_others |
Total cost of material of other non-concrete related items |
dollar |
387 |
Tot_Labor_containment |
Total cost of labor of containment |
dollar |
388 |
Tot_Mat_containment |
Total cost of material of containment |
dollar |