PWR12-BE Variables
Index |
Name |
Description |
Unit |
|---|---|---|---|
1 |
c_turbine |
Turbine equipment cost |
million |
2 |
n_231 |
Scaling exponent law |
1 |
3 |
p_in |
Inlet turbine pressure |
bar |
4 |
scale_tur_231_fac |
factory scale of cost from turbine |
1 |
5 |
c_231_fac |
Turbine factory cost |
million |
6 |
prn_fac_231_lab |
labor portion of cost from factory of 231 |
1 |
7 |
prn_fac_231_mat |
material portion of cost from factory of 231 |
1 |
8 |
c_262_fac |
Heat Rejection System factory cost |
million |
9 |
c_262_lab |
Heat Rejection System labor cost |
million |
10 |
c_262_mat |
Heat Rejection System material cost |
million |
11 |
mwth |
user_input mwth |
MW |
12 |
scale_0.8 |
thermal scale 0.8 |
1 |
13 |
c_233_fac |
Condensing Systems factory cost |
million |
14 |
c_233_lab |
Condensing Systems labor cost |
million |
15 |
c_233_mat |
Condensing Systems material cost |
million |
16 |
escalate_1987 |
escalator 1987 to 2017 |
1 |
17 |
ref_252_fac |
Air, water and steam service systems factory cost |
million |
18 |
ref_252_lab |
Air, water and steam service systems labor cost |
million |
19 |
ref_252_mat |
Air, water and steam service systems material cost |
million |
20 |
c_221.12_cs_weight |
weight of the carbon steel parts of the vessel |
ton |
21 |
c_221.12_ss_weight |
weight of the stainless steel cladding of the vessel |
ton |
22 |
c_221.12_tol_weight |
weight of the reactor primary vessel |
ton |
23 |
c_rpv_lab |
per-unit mass cost of labor of RPV |
million/ton |
24 |
c_rpv_mat |
per-unit mass cost of material of RPV |
million/ton |
25 |
ref_211_fac |
yardwork factory cost |
million |
26 |
ref_211_lab |
yardwork labor cost |
million |
27 |
ref_211_mat |
yardwork material cost |
million |
28 |
ref_222.13_fac |
steam generator equipment factory cost |
million |
29 |
no_of_sg |
total number of SG |
1 |
30 |
c_SG_per_unit_lab |
unit site labor cost of SG |
million |
31 |
c_SG_per_unit_mat |
unit site material cost of SG |
million |
32 |
c_234_fac |
feedwater heating system factory cost |
million |
33 |
c_234_lab |
feedwater heating system labor cost |
million |
34 |
c_234_mat |
feedwater heating system material cost |
million |
35 |
c_213_fac |
Turbine building structure factory cost |
million |
36 |
c_213_lab |
Turbine building structure labor cost |
million |
37 |
c_213_mat |
Turbine building structure material cost |
million |
38 |
c_231_lab |
Turbine labor cost |
million |
39 |
c_231_mat |
Turbine material cost |
million |
40 |
prn_235_of_231_fac |
factory portion of cost from factory of 231 |
1 |
41 |
prn_235_of_231_lab |
labor portion of cost from labor of 231 |
1 |
42 |
prn_235_of_231_mat |
material portion of cost from labor of 231 |
1 |
43 |
mwe |
user_input MWE |
MW |
44 |
scale_0.4 |
electric scale 0.4 |
1 |
45 |
c_241_fac |
Switchgear factory cost |
million |
46 |
c_241_lab |
Switchgear labor cost |
million |
47 |
c_241_mat |
Switchgear material cost |
million |
48 |
c_242_fac |
Station service equipment factory cost |
million |
49 |
c_242_lab |
Station service equipment labor cost |
million |
50 |
c_242_mat |
Station service equipment material cost |
million |
51 |
c_245_fac |
Electric structure and wiring contnr. factory cost |
million |
52 |
c_245_lab |
Electric structure and wiring contnr. labor cost |
million |
53 |
c_245_mat |
Electric structure and wiring contnr. material cost |
million |
54 |
c_246_fac |
Power and control wiring factory cost |
million |
55 |
c_246_lab |
Power and control wiring labor cost |
million |
56 |
c_246_mat |
Power and control wiring material cost |
million |
57 |
ref_227_fac |
Reactor instrumentation and control factory cost |
million |
58 |
ref_227_lab |
Reactor instrumentation and control labor cost |
million |
59 |
ref_227_mat |
Reactor instrumentation and control material cost |
million |
60 |
ref_224_fac |
Radwaste processing factory cost |
million |
61 |
ref_224_lab |
Radwaste processing labor cost |
million |
62 |
ref_224_mat |
Radwaste processing material cost |
million |
63 |
scale_1.0 |
thermal scale 1.0 |
1 |
64 |
c_226.7_fac |
Aux Cool Sys factory cost |
million |
65 |
c_226.7_lab |
Aux Cool Sys labor cost |
million |
66 |
c_226.7_mat |
Aux Cool Sys material cost |
million |
67 |
no_of_rcpump |
total number of reactor coolant pumps |
1 |
68 |
c_pump_per_unit_fac |
Reactor coolant pumps Factory Equipment Cost |
million |
69 |
c_pump_ap1000 |
AP1000 factory cost of main coolant pumps |
million |
70 |
CH_12be |
CH factor of PWR-12 BE |
gpm*feet |
71 |
CH_AP1000 |
CH factor of AP1000 |
gpm*feet |
72 |
scale_0.52 |
SH scale 0,52 |
1 |
73 |
c_226.4_fac |
Coolant Treatment & Recycle factory cost |
million |
74 |
c_226.4_lab |
Coolant Treatment & Recycle labor cost |
million |
75 |
c_226.4_mat |
Coolant Treatment & Recycle material cost |
million |
76 |
c_222.11_fac |
Fluid Circulation Drive System (Field Cost 222) factory cost |
million |
77 |
c_222.11_lab |
Fluid Circulation Drive System (Field Cost 222) labor cost |
million |
78 |
c_222.11_mat |
Fluid Circulation Drive System (Field Cost 222) material cost |
million |
79 |
c_222.12_fac |
Reactor Coolant Piping System (Field Cost 222) factory cost |
million |
80 |
c_222.12_lab |
Reactor Coolant Piping System (Field Cost 222) labor cost |
million |
81 |
c_222.12_mat |
Reactor Coolant Piping System (Field Cost 222) material cost |
million |
82 |
c_222.13_fac |
Steam Generator Equipment (Field Cost 222) factory cost |
million |
83 |
c_222.13_lab |
Steam Generator Equipment (Field Cost 222) labor cost |
million |
84 |
c_222.13_mat |
Steam Generator Equipment (Field Cost 222) material cost |
million |
85 |
c_222.14_fac |
Pressurizing System (Field Cost 222) factory cost |
million |
86 |
c_222.14_lab |
Pressurizing System (Field Cost 222) labor cost |
million |
87 |
c_222.14_mat |
Pressurizing System (Field Cost 222) material cost |
million |
88 |
c_222_fac |
Main heat transfer transport system factory cost |
million |
89 |
c_222_lab |
Main heat transfer transport system labor cost |
million |
90 |
c_222_mat |
Main heat transfer transport system material cost |
million |
91 |
c_zero |
place holder for weight |
ton |
92 |
c_220A.222_ss_weight |
weight of the stainless steel reactor coolant piping |
ton |
93 |
c_220A.2121_ss_weight |
weight of the stainless steel lower internals |
ton |
94 |
c_220A.2122_ss_weight |
weight of the stainless steel upper internals |
ton |
95 |
no_of_cr |
Total control rods |
1 |
96 |
no_of_crd |
Total control rod drives |
1 |
97 |
c_cr_per_unit_fac |
unit cost of rod |
million |
98 |
c_crd_per_unit_fac |
unit cost of rod drive |
million |
99 |
c_220A.224_cs_weight_plate |
weight of the carbon steel pressurizer |
ton |
100 |
c_220A.224_ss_weight |
weight of the stainless steel pressurizer |
ton |
101 |
c_237_lab |
Turbine plant miscellaneous items labor cost |
million |
102 |
c_237_mat |
Turbine plant miscellaneous items material cost |
million |
103 |
ref_228_lab |
Reactor plant miscellaneous items labor cost |
million |
104 |
ref_228_mat |
Reactor plant miscellaneous items material cost |
million |
105 |
ref_236_fac |
Reactor instrumentation and control factory cost |
million |
106 |
ref_236_lab |
Reactor instrumentation and control labor cost |
million |
107 |
ref_236_mat |
Reactor instrumentation and control material cost |
million |
108 |
ref_253_fac |
Communications equipment factory cost |
million |
109 |
ref_253_lab |
Communications equipment labor cost |
million |
110 |
ref_253_mat |
Communications equipment material cost |
million |
111 |
ref_221.14_mat |
Transport To Site (Field Cost 221) material cost |
million |
112 |
ref_220A.254_fac |
Fuel Storage Racks (NSSS) factory cost |
million |
113 |
c_220A.225_ss_weight |
weight of the stainless steel pressurizer relief tank (NSSS) |
ton |
114 |
c_220A.2324_ss_weight |
weight of the stainless steel boron injection surge tank (NSSS) |
ton |
115 |
c_220A.2322_tot_weight |
total weight of accumulator tank (NSSS) |
ton |
116 |
prn_220A.2322cs |
portion of weight made by carbon steel accumulator tank (NSSS) |
1 |
117 |
prn_220A.2322ss |
portion of weight made by stainless steel accumulator tank (NSSS) |
1 |
118 |
no_of_acu |
number of accumulator tank |
1 |
119 |
c_220A.2323_tot_weight |
total weight of Boron injection tank (NSSS) |
ton |
120 |
prn_220A.2323cs |
portion of weight made by carbon steel Boron injection tank (NSSS) |
1 |
121 |
prn_220A.2323ss |
portion of weight made by stainless steel Boron injection tank (NSSS) |
1 |
122 |
no_of_bit |
number of Boron injection tank |
1 |
123 |
c_220A.251_cs_weight |
weight of the carbon steel parts of the fuel handling tools (NSSS) |
ton |
124 |
c_220A.251_ss_weight |
weight of the stainless steel cladding of the fuel handling tools (NSSS) |
ton |
125 |
factor_220A.251 |
factor to calculate fuel handling tool |
1 |
126 |
c_220A.2312_cs_weight |
weight of the carbon steel parts of the residual heat removal heat exchanger (NSSS) |
ton |
127 |
c_220A.2312_ss_weight |
weight of the stainless steel cladding of the residual heat removal heat exchanger (NSSS) |
ton |
128 |
factor_220A.2312 |
facility number of residual heat removal heat exchanger (NSSS) |
1 |
129 |
vol_223.4 |
volume of Containment Spray System (Field Cost 223) |
m^3 |
130 |
c_223.4_unit_vol_fac |
unit volume cost of containment spray system (Field Cost 223) for factory cost |
dollar/m^3 |
131 |
c_223.4_unit_vol_lab |
unit volume cost of containment spray system (Field Cost 223) for labor cost |
dollar/m^3 |
132 |
c_223.4_unit_vol_mat |
unit volume cost of containment spray system (Field Cost 223) for material cost |
dollar/m^3 |
133 |
escalate_1978 |
escalator 1978 to 2017 |
1 |
134 |
ref_220A.254_1978 |
Fuel Storage Racks (NSSS) cost from Combustion Engineering (1978) |
million |
135 |
c_226.4111_fac |
factory cost of pump 226.4111 |
million |
136 |
c_226.4112_fac |
factory cost of pump 226.4112 |
million |
137 |
c_226.41131_fac |
factory cost of pump 226.41131 |
million |
138 |
c_226.41132_fac |
factory cost of pump 226.41132 |
million |
139 |
c_226.4114_fac |
factory cost of pump 226.4114 |
million |
140 |
c_226.41151_fac |
factory cost of pump 226.41151 |
million |
141 |
c_226.41152_fac |
factory cost of pump 226.41152 |
million |
142 |
c_226.4121_fac |
factory cost of pump 226.4121 |
million |
143 |
c_226.4122_fac |
factory cost of pump 226.4122 |
million |
144 |
c_226.4123_fac |
factory cost of pump 226.4123 |
million |
145 |
c_226.4124_fac |
factory cost of pump 226.4124 |
million |
146 |
c_226.4125_fac |
factory cost of pump 226.4125 |
million |
147 |
c_226.4126_fac |
factory cost of pump 226.4126 |
million |
148 |
c_226.4127_fac |
factory cost of pump 226.4127 |
million |
149 |
c_226.4128_fac |
factory cost of pump 226.4128 |
million |
150 |
c_226.4133_fac |
factory cost of pump 226.4133 |
million |
151 |
c_226.4134_fac |
factory cost of pump 226.4134 |
million |
152 |
c_226.4135_fac |
factory cost of pump 226.4135 |
million |
153 |
c_226.4131_fac |
factory cost of pump 226.4131 |
million |
154 |
c_226.4141_fac |
factory cost of pump 226.4141 |
million |
155 |
c_226.4142_fac |
factory cost of pump 226.4142 |
million |
156 |
c_226.4143_fac |
factory cost of pump 226.4143 |
million |
157 |
c_226.4144_fac |
factory cost of pump 226.4144 |
million |
158 |
c_226.4145_fac |
factory cost of pump 226.4145 |
million |
159 |
c_251.12_fac |
factory cost of Cont. build |
million |
160 |
c_251.111_fac |
factory cost of Turbine room |
million |
161 |
c_251.112_fac |
factory cost of Heater bay |
million |
162 |
c_251.16_fac |
factory cost of Various |
million |
163 |
c_251.17_fac |
factory cost of Diesel building |
million |
164 |
c_251.12_lab |
labor cost of Cont. build |
million |
165 |
c_251.111_lab |
labor cost of Turbine room |
million |
166 |
c_251.112_lab |
labor cost of Heater bay |
million |
167 |
c_251.16_lab |
labor cost of Various |
million |
168 |
c_251.17_lab |
labor cost of Diesel building |
million |
169 |
c_251.12_mat |
material cost of Cont. build |
million |
170 |
c_251.111_mat |
material cost of Turbine room |
million |
171 |
c_251.112_mat |
material cost of Heater bay |
million |
172 |
c_251.16_mat |
material cost of Various |
million |
173 |
c_251.17_mat |
material cost of Diesel building |
million |
174 |
fac_223.1 |
factor to calculate RHR System |
1 |
175 |
prn_223.1_fac |
factory cost prtion of RHR |
1 |
176 |
prn_223.1_lab |
labor cost prtion of RHR |
1 |
177 |
prn_223.1_mat |
material cost prtion of RHR |
1 |
178 |
c_220A.2311_fac |
factory cost of residual heat removal Pumps & Drives (NSSS) |
million |
179 |
c_220A.2312_fac |
factory cost of residual heat removal Heat Exchanger (NSSS) |
million |
180 |
fac_223.3 |
factor to calculate safety injection system |
1 |
181 |
prn_223.3_fac |
factory cost prtion of safety injection system |
1 |
182 |
prn_223.3_lab |
labor cost prtion of safety injection system |
1 |
183 |
prn_223.3_mat |
material cost prtion of safety injection system |
1 |
184 |
c_220A.2321_fac |
factory cost of Safety Injection Pumps And Drives (NSSS) |
million |
185 |
c_220A.2322_fac |
factory cost of Accumulator Tank (NSSS) |
million |
186 |
c_220A.2323_fac |
factory cost of Boron Injection Tank (NSSS) |
million |
187 |
c_220A.2324_fac |
factory cost of Boron Injection Surge Tank (NSSS) |
million |
188 |
c_220A.2325_fac |
factory cost of Boron Injection Recirc. Pump & Drives (NSSS) |
million |
189 |
c_218B_fac |
Placeholder |
million |
190 |
c_218J_fac |
Placeholder |
million |
191 |
c_218T_fac |
Placeholder |
million |
192 |
c_220A.2311_fac |
Placeholder |
million |
193 |
c_220A.2321_fac |
Placeholder |
million |
194 |
c_220A.2325_fac |
Placeholder |
million |
195 |
c_218B_lab |
Placeholder |
million |
196 |
c_218J_lab |
Placeholder |
million |
197 |
c_218T_lab |
Placeholder |
million |
198 |
c_218B_mat |
Placeholder |
million |
199 |
c_218J_mat |
Placeholder |
million |
200 |
c_218T_mat |
Placeholder |
million |
201 |
CPI |
The Consumer Price Index |
1 |
202 |
Void_fraction |
Void fraction of the inside of the containment |
1 |
203 |
liner_fraction |
liner fraction of containment |
1 |
204 |
Cont_H_tot_m |
Containment total height |
m |
205 |
Cont_rad_out_m |
Containment outside radius |
m |
206 |
Cont_shell_t_m |
Shell wall thickness |
m |
207 |
Cont_H_wall_m |
Containment wall height |
m |
208 |
Basemat_t_m |
Basemat thickness |
m |
209 |
Dome_t_m |
Dome thickness |
m |
210 |
Intern_wall_t |
Internal wall average thickness |
m |
211 |
React_cav_A_m2 |
Reactor cavity area |
m^2 |
212 |
Cont_rad_in_m |
Containment inside radius |
m |
213 |
Basemat_s_m2 |
Basemat surface |
m^2 |
214 |
Basemat_v_m3 |
Basemat volume |
m^3 |
215 |
Walls_s_m2 |
Walls surface |
m^2 |
216 |
Walls_v_m3 |
Walls volume |
m^3 |
217 |
Dome_rad_in_m |
Dome inside radius |
m |
218 |
Dome_s_m2 |
Roof surface |
m^2 |
219 |
Dome_v_m3 |
Roof volume |
m^3 |
220 |
Intern_tot_v_m3 |
Tot intenal Volume |
m^3 |
221 |
Internal_v_m3 |
Building internal volume |
m^3 |
222 |
Internal_s_m2 |
Building internal surface |
m^2 |
223 |
Struct_v_m3 |
volume of the structures |
m^3 |
224 |
Inside_liner_s |
Inside liner surface |
m^2 |
225 |
Liner_s_m2 |
Liner Surface |
m^2 |
226 |
Surf_paint_m2 |
painted surface |
m^2 |
227 |
infl |
Inflation rate |
1 |
228 |
Unit_EEDB_Labor_Cadweld_Substr |
Unit cost of Labor Cadweld Substructure (base mat) in EEDB |
dollar/m^3 |
229 |
Unit_EEDB_Labor_Cadweld_Superstr |
Unit cost of Labor Cadweld Superstructure (shell) in EEDB |
dollar/m^3 |
230 |
Unit_EEDB_Labor_Cadweld_Dome |
Unit cost of Labor Cadweld Superstructure (dome) in EEDB |
dollar/m^3 |
231 |
Unit_EEDB_Labor_Cadweld_Interior |
Unit cost of Labor Cadweld Interior structure in EEDB |
dollar/m^3 |
232 |
Unit_EEDB_Labor_Concrete_Substr |
Unit cost of Labor Concrete Substructure (base mat) in EEDB |
dollar/m^3 |
233 |
Unit_EEDB_Labor_Concrete_Superstr |
Unit cost of Labor Concrete Superstructure (shell) in EEDB |
dollar/m^3 |
234 |
Unit_EEDB_Labor_Concrete_Dome |
Unit cost of Labor Concrete Superstructure (dome) in EEDB |
dollar/m^3 |
235 |
Unit_EEDB_Labor_Concrete_Interior |
Unit cost of Labor Concrete Interior structure in EEDB |
dollar/m^3 |
236 |
Unit_EEDB_Labor_Constr_joints_Substr |
Unit cost of Labor Construction joints Substructure (base mat) in EEDB |
dollar/m^2 |
237 |
Unit_EEDB_Labor_Constr_joints_Superstr |
Unit cost of Labor Construction joints Superstructure (shell) in EEDB |
dollar/m^2 |
238 |
Unit_EEDB_Labor_Constr_joints_Dome |
Unit cost of Labor Construction joints Superstructure (dome) in EEDB |
dollar/m^2 |
239 |
Unit_EEDB_Labor_Constr_joints_Interior |
Unit cost of Labor Construction joints Interior structure in EEDB |
dollar/m^2 |
240 |
Unit_EEDB_Labor_Embedded_steel_Substr |
Unit cost of Labor Embedded steel Substructure (base mat) in EEDB |
dollar/m^3 |
241 |
Unit_EEDB_Labor_Embedded_steel_Superstr |
Unit cost of Labor Embedded steel Superstructure (shell) in EEDB |
dollar/m^3 |
242 |
Unit_EEDB_Labor_Embedded_steel_Dome |
Unit cost of Labor Embedded steel Superstructure (dome) in EEDB |
dollar/m^3 |
243 |
Unit_EEDB_Labor_Embedded_steel_Interior |
Unit cost of Labor Embedded steel Interior structure in EEDB |
dollar/m^3 |
244 |
Unit_EEDB_Labor_Formwork_Substr |
Unit cost of Labor Formwork Substructure (base mat) in EEDB |
dollar/m^2 |
245 |
Unit_EEDB_Labor_Formwork_Superstr |
Unit cost of Labor Formwork Superstructure (shell) in EEDB |
dollar/m^2 |
246 |
Unit_EEDB_Labor_Formwork_Dome |
Unit cost of Labor Formwork Superstructure (dome) in EEDB |
dollar/m^2 |
247 |
Unit_EEDB_Labor_Formwork_Interior |
Unit cost of Labor Formwork Interior structure in EEDB |
dollar/m^2 |
248 |
Unit_EEDB_Labor_Maj_supp_embedments_Interior |
Unit cost of Labor Major Support Embedments Interior structure in EEDB |
dollar/m^3 |
249 |
Unit_EEDB_Labor_Reinforc_steel_Substr |
Unit cost of Labor Reinforc steel Substructure (base mat) in EEDB |
dollar/m^3 |
250 |
Unit_EEDB_Labor_Reinforc_steel_Superstr |
Unit cost of Labor Reinforc steel Superstructure (shell) in EEDB |
dollar/m^3 |
251 |
Unit_EEDB_Labor_Reinforc_steel_Dome |
Unit cost of Labor Reinforc steel Superstructure (dome) in EEDB |
dollar/m^3 |
252 |
Unit_EEDB_Labor_Reinforc_steel_Interior |
Unit cost of Labor Reinforc steel Interior structure in EEDB |
dollar/m^3 |
253 |
Unit_EEDB_Labor_Rubbing_surfaces_Superstr |
Unit cost of Labor Rubbing surfaces Superstructure (shell) in EEDB |
dollar/m^2 |
254 |
Unit_EEDB_Labor_Rubbing_surfaces_Dome |
Unit cost of Labor Rubbing surfaces Superstructure (dome) in EEDB |
dollar/m^2 |
255 |
Unit_EEDB_Labor_Rubbing_surfaces_Interior |
Unit cost of Labor Rubbing surfaces Interior structure in EEDB |
dollar/m^2 |
256 |
Unit_EEDB_Labor_Waterproofing_Substr |
Unit cost of Labor Waterproofing Substructure (base mat) in EEDB |
dollar/m^2 |
257 |
Unit_EEDB_Labor_Waterproofing_Superstr |
Unit cost of Labor Waterproofing Superstructure (shell) in EEDB |
dollar/m^2 |
258 |
Unit_EEDB_Labor_Waterproofing_Dome |
Unit cost of Labor Waterproofing Superstructure (dome) in EEDB |
dollar/m^2 |
259 |
Unit_EEDB_Labor_Welded_wire_fabric_Substr |
Unit cost of Labor Welded wire fabric Substructure (base mat) in EEDB |
dollar/m^2 |
260 |
Unit_EEDB_Labor_Lighting_Power |
Unit cost of Labor Lighting Power in EEDB |
dollar/m^3 |
261 |
Unit_EEDB_Labor_Plumb_drains |
Unit cost of Labor Plumb drains in EEDB |
dollar/m^3 |
262 |
Unit_EEDB_Labor_Special_HVAC |
Unit cost of Labor Special HVAC in EEDB |
dollar/m^3 |
263 |
Unit_EEDB_Labor_other |
Unit cost of Labor other in EEDB |
dollar/m^3 |
264 |
Unit_EEDB_Labor_Misc_steel_frames |
Unit cost of Labor miscellaneous steel frames in EEDB |
dollar/m^3 |
265 |
Unit_EEDB_Labor_React_cav_liner |
Unit cost of Labor Reactor cavity liner plate in EEDB |
dollar/m^2 |
266 |
Unit_EEDB_Labor_Struct_steel |
Unit cost of Labor Struct steel in EEDB |
dollar/m^3 |
267 |
Unit_EEDB_Labor_cont_liner |
Unit cost of Labor Containment liner in EEDB |
dollar/m^2 |
268 |
Unit_EEDB_Labor_fl_grate_handrail_stairs |
Unit cost of Labor Floor grating (galvanized), Handrail, Stair treads in EEDB |
dollar/m^3 |
269 |
Unit_EEDB_Labor_painting |
Unit cost of Labor painting in EEDB |
dollar/m^2 |
270 |
Unit_EEDB_Mat_Cadweld_Substr |
Unit cost of Material Cadweld Substructure (base mat) in EEDB |
dollar/m^3 |
271 |
Unit_EEDB_Mat_Cadweld_Superstr |
Unit cost of Material Cadweld Superstructure (shell) in EEDB |
dollar/m^3 |
272 |
Unit_EEDB_Mat_Cadweld_Dome |
Unit cost of Material Cadweld Superstructure (dome) in EEDB |
dollar/m^3 |
273 |
Unit_EEDB_Mat_Cadweld_Interior |
Unit cost of Material Cadweld Interior structure in EEDB |
dollar/m^3 |
274 |
Unit_EEDB_Mat_Concrete_Substr |
Unit cost of Material Concrete Substructure (base mat) in EEDB |
dollar/m^3 |
275 |
Unit_EEDB_Mat_Concrete_Superstr |
Unit cost of Material Concrete Superstructure (shell) in EEDB |
dollar/m^3 |
276 |
Unit_EEDB_Mat_Concrete_Dome |
Unit cost of Material Concrete Superstructure (dome) in EEDB |
dollar/m^3 |
277 |
Unit_EEDB_Mat_Concrete_Interior |
Unit cost of Material Concrete Interior structure in EEDB |
dollar/m^3 |
278 |
Unit_EEDB_Mat_Constr_joints_Substr |
Unit cost of Material Construction joints Substructure (base mat) in EEDB |
dollar/m^2 |
279 |
Unit_EEDB_Mat_Constr_joints_Superstr |
Unit cost of Material Construction joints Superstructure (shell) in EEDB |
dollar/m^2 |
280 |
Unit_EEDB_Mat_Constr_joints_Dome |
Unit cost of Material Construction joints Superstructure (dome) in EEDB |
dollar/m^2 |
281 |
Unit_EEDB_Mat_Constr_joints_Interior |
Unit cost of Material Construction joints Interior structure in EEDB |
dollar/m^2 |
282 |
Unit_EEDB_Mat_Embedded_steel_Substr |
Unit cost of Material Embedded steel Substructure (base mat) in EEDB |
dollar/m^3 |
283 |
Unit_EEDB_Mat_Embedded_steel_Superstr |
Unit cost of Material Embedded steel Superstructure (shell) in EEDB |
dollar/m^3 |
284 |
Unit_EEDB_Mat_Embedded_steel_Dome |
Unit cost of Material Embedded steel Superstructure (dome) in EEDB |
dollar/m^3 |
285 |
Unit_EEDB_Mat_Embedded_steel_Interior |
Unit cost of Material Embedded steel Interior structure in EEDB |
dollar/m^3 |
286 |
Unit_EEDB_Mat_Formwork_Substr |
Unit cost of Material Formwork Substructure (base mat) in EEDB |
dollar/m^2 |
287 |
Unit_EEDB_Mat_Formwork_Superstr |
Unit cost of Material Formwork Superstructure (shell) in EEDB |
dollar/m^2 |
288 |
Unit_EEDB_Mat_Formwork_Dome |
Unit cost of Material Formwork Superstructure (dome) in EEDB |
dollar/m^2 |
289 |
Unit_EEDB_Mat_Formwork_Interior |
Unit cost of Material Formwork Interior structure in EEDB |
dollar/m^2 |
290 |
Unit_EEDB_Mat_Maj_supp_embedments_Interior |
Unit cost of Material Major Support Embedments Interior structure in EEDB |
dollar/m^3 |
291 |
Unit_EEDB_Mat_Reinforc_steel_Substr |
Unit cost of Material Reinforc steel Substructure (base mat) in EEDB |
dollar/m^3 |
292 |
Unit_EEDB_Mat_Reinforc_steel_Superstr |
Unit cost of Material Reinforc steel Superstructure (shell) in EEDB |
dollar/m^3 |
293 |
Unit_EEDB_Mat_Reinforc_steel_Dome |
Unit cost of Material Reinforc steel Superstructure (dome) in EEDB |
dollar/m^3 |
294 |
Unit_EEDB_Mat_Reinforc_steel_Interior |
Unit cost of Material Reinforc steel Interior structure in EEDB |
dollar/m^3 |
295 |
Unit_EEDB_Mat_Rubbing_surfaces_Superstr |
Unit cost of Material Rubbing surfaces Superstructure (shell) in EEDB |
dollar/m^2 |
296 |
Unit_EEDB_Mat_Rubbing_surfaces_Dome |
Unit cost of Material Rubbing surfaces Superstructure (dome) in EEDB |
dollar/m^2 |
297 |
Unit_EEDB_Mat_Rubbing_surfaces_Interior |
Unit cost of Material Rubbing surfaces Interior structure in EEDB |
dollar/m^2 |
298 |
Unit_EEDB_Mat_Waterproofing_Substr |
Unit cost of Material Waterproofing Substructure (base mat) in EEDB |
dollar/m^2 |
299 |
Unit_EEDB_Mat_Waterproofing_Superstr |
Unit cost of Material Waterproofing Superstructure (shell) in EEDB |
dollar/m^2 |
300 |
Unit_EEDB_Mat_Waterproofing_Dome |
Unit cost of Material Waterproofing Superstructure (dome) in EEDB |
dollar/m^2 |
301 |
Unit_EEDB_Mat_Welded_wire_fabric_Substr |
Unit cost of Material Welded wire fabric Substructure (base mat) in EEDB |
dollar/m^2 |
302 |
Unit_EEDB_Mat_Lighting_Power |
Unit cost of Material Lighting Power in EEDB |
dollar/m^3 |
303 |
Unit_EEDB_Mat_Plumb_drains |
Unit cost of Material Plumb drains in EEDB |
dollar/m^3 |
304 |
Unit_EEDB_Mat_Special_HVAC |
Unit cost of Material Special HVAC in EEDB |
dollar/m^3 |
305 |
Unit_EEDB_Mat_other |
Unit cost of Material other in EEDB |
dollar/m^3 |
306 |
Unit_EEDB_Mat_Misc_steel_frames |
Unit cost of Material miscellaneous steel frames in EEDB |
dollar/m^3 |
307 |
Unit_EEDB_Mat_React_cav_liner |
Unit cost of Material Reactor cavity liner plate in EEDB |
dollar/m^2 |
308 |
Unit_EEDB_Mat_Struct_steel |
Unit cost of Material Struct steel in EEDB |
dollar/m^3 |
309 |
Unit_EEDB_Mat_cont_liner |
Unit cost of Material Containment liner in EEDB |
dollar/m^2 |
310 |
Unit_EEDB_Mat_fl_grate_handrail_stairs |
Unit cost of Material Floor grating (galvanized), Handrail, Stair treads in EEDB |
dollar/m^3 |
311 |
Unit_EEDB_Mat_painting |
Unit cost of Material painting in EEDB |
dollar/m^2 |
312 |
Unit_Labor_Cadweld_Substr |
Unit cost of Labor Cadweld Substructure (base mat) in 2017 |
dollar/m^3 |
313 |
Unit_Labor_Cadweld_Superstr |
Unit cost of Labor Cadweld Superstructure (shell) in 2017 |
dollar/m^3 |
314 |
Unit_Labor_Cadweld_Dome |
Unit cost of Labor Cadweld Superstructure (dome) in 2017 |
dollar/m^3 |
315 |
Unit_Labor_Cadweld_Interior |
Unit cost of Labor Cadweld Interior structure in 2017 |
dollar/m^3 |
316 |
Unit_Labor_Concrete_Substr |
Unit cost of Labor Concrete Substructure (base mat) in 2017 |
dollar/m^3 |
317 |
Unit_Labor_Concrete_Superstr |
Unit cost of Labor Concrete Superstructure (shell) in 2017 |
dollar/m^3 |
318 |
Unit_Labor_Concrete_Dome |
Unit cost of Labor Concrete Superstructure (dome) in 2017 |
dollar/m^3 |
319 |
Unit_Labor_Concrete_Interior |
Unit cost of Labor Concrete Interior structure in 2017 |
dollar/m^3 |
320 |
Unit_Labor_Constr_joints_Substr |
Unit cost of Labor Construction joints Substructure (base mat) in 2017 |
dollar/m^2 |
321 |
Unit_Labor_Constr_joints_Superstr |
Unit cost of Labor Construction joints Superstructure (shell) in 2017 |
dollar/m^2 |
322 |
Unit_Labor_Constr_joints_Dome |
Unit cost of Labor Construction joints Superstructure (dome) in 2017 |
dollar/m^2 |
323 |
Unit_Labor_Constr_joints_Interior |
Unit cost of Labor Construction joints Interior structure in 2017 |
dollar/m^2 |
324 |
Unit_Labor_Embedded_steel_Substr |
Unit cost of Labor Embedded steel Substructure (base mat) in 2017 |
dollar/m^3 |
325 |
Unit_Labor_Embedded_steel_Superstr |
Unit cost of Labor Embedded steel Superstructure (shell) in 2017 |
dollar/m^3 |
326 |
Unit_Labor_Embedded_steel_Dome |
Unit cost of Labor Embedded steel Superstructure (dome) in 2017 |
dollar/m^3 |
327 |
Unit_Labor_Embedded_steel_Interior |
Unit cost of Labor Embedded steel Interior structure in 2017 |
dollar/m^3 |
328 |
Unit_Labor_Formwork_Substr |
Unit cost of Labor Formwork Substructure (base mat) in 2017 |
dollar/m^2 |
329 |
Unit_Labor_Formwork_Superstr |
Unit cost of Labor Formwork Superstructure (shell) in 2017 |
dollar/m^2 |
330 |
Unit_Labor_Formwork_Dome |
Unit cost of Labor Formwork Superstructure (dome) in 2017 |
dollar/m^2 |
331 |
Unit_Labor_Formwork_Interior |
Unit cost of Labor Formwork Interior structure in 2017 |
dollar/m^2 |
332 |
Unit_Labor_Maj_supp_embedments_Interior |
Unit cost of Labor Major Support Embedments Interior structure in 2017 |
dollar/m^3 |
333 |
Unit_Labor_Reinforc_steel_Substr |
Unit cost of Labor Reinforc steel Substructure (base mat) in 2017 |
dollar/m^3 |
334 |
Unit_Labor_Reinforc_steel_Superstr |
Unit cost of Labor Reinforc steel Superstructure (shell) in 2017 |
dollar/m^3 |
335 |
Unit_Labor_Reinforc_steel_Dome |
Unit cost of Labor Reinforc steel Superstructure (dome) in 2017 |
dollar/m^3 |
336 |
Unit_Labor_Reinforc_steel_Interior |
Unit cost of Labor Reinforc steel Interior structure in 2017 |
dollar/m^3 |
337 |
Unit_Labor_Rubbing_surfaces_Superstr |
Unit cost of Labor Rubbing surfaces Superstructure (shell) in 2017 |
dollar/m^2 |
338 |
Unit_Labor_Rubbing_surfaces_Dome |
Unit cost of Labor Rubbing surfaces Superstructure (dome) in 2017 |
dollar/m^2 |
339 |
Unit_Labor_Rubbing_surfaces_Interior |
Unit cost of Labor Rubbing surfaces Interior structure in 2017 |
dollar/m^2 |
340 |
Unit_Labor_Waterproofing_Substr |
Unit cost of Labor Waterproofing Substructure (base mat) in 2017 |
dollar/m^2 |
341 |
Unit_Labor_Waterproofing_Superstr |
Unit cost of Labor Waterproofing Superstructure (shell) in 2017 |
dollar/m^2 |
342 |
Unit_Labor_Waterproofing_Dome |
Unit cost of Labor Waterproofing Superstructure (dome) in 2017 |
dollar/m^2 |
343 |
Unit_Labor_Welded_wire_fabric_Substr |
Unit cost of Labor Welded wire fabric Substructure (base mat) in 2017 |
dollar/m^2 |
344 |
Unit_Labor_Lighting_Power |
Unit cost of Labor Lighting Power in 2017 |
dollar/m^3 |
345 |
Unit_Labor_Plumb_drains |
Unit cost of Labor Plumb drains in 2017 |
dollar/m^3 |
346 |
Unit_Labor_Special_HVAC |
Unit cost of Labor Special HVAC in 2017 |
dollar/m^3 |
347 |
Unit_Labor_other |
Unit cost of Labor other in 2017 |
dollar/m^3 |
348 |
Unit_Labor_Misc_steel_frames |
Unit cost of Labor miscellaneous steel frames in 2017 |
dollar/m^3 |
349 |
Unit_Labor_React_cav_liner |
Unit cost of Labor Reactor cavity liner plate in 2017 |
dollar/m^2 |
350 |
Unit_Labor_Struct_steel |
Unit cost of Labor Struct steel in 2017 |
dollar/m^3 |
351 |
Unit_Labor_cont_liner |
Unit cost of Labor Containment liner in 2017 |
dollar/m^2 |
352 |
Unit_Labor_fl_grate_handrail_stairs |
Unit cost of Labor Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar/m^3 |
353 |
Unit_Labor_painting |
Unit cost of Labor painting in 2017 |
dollar/m^2 |
354 |
Unit_Mat_Cadweld_Substr |
Unit cost of Material Cadweld Substructure (base mat) in 2017 |
dollar/m^3 |
355 |
Unit_Mat_Cadweld_Superstr |
Unit cost of Material Cadweld Superstructure (shell) in 2017 |
dollar/m^3 |
356 |
Unit_Mat_Cadweld_Dome |
Unit cost of Material Cadweld Superstructure (dome) in 2017 |
dollar/m^3 |
357 |
Unit_Mat_Cadweld_Interior |
Unit cost of Material Cadweld Interior structure in 2017 |
dollar/m^3 |
358 |
Unit_Mat_Concrete_Substr |
Unit cost of Material Concrete Substructure (base mat) in 2017 |
dollar/m^3 |
359 |
Unit_Mat_Concrete_Superstr |
Unit cost of Material Concrete Superstructure (shell) in 2017 |
dollar/m^3 |
360 |
Unit_Mat_Concrete_Dome |
Unit cost of Material Concrete Superstructure (dome) in 2017 |
dollar/m^3 |
361 |
Unit_Mat_Concrete_Interior |
Unit cost of Material Concrete Interior structure in 2017 |
dollar/m^3 |
362 |
Unit_Mat_Constr_joints_Substr |
Unit cost of Material Construction joints Substructure (base mat) in 2017 |
dollar/m^2 |
363 |
Unit_Mat_Constr_joints_Superstr |
Unit cost of Material Construction joints Superstructure (shell) in 2017 |
dollar/m^2 |
364 |
Unit_Mat_Constr_joints_Dome |
Unit cost of Material Construction joints Superstructure (dome) in 2017 |
dollar/m^2 |
365 |
Unit_Mat_Constr_joints_Interior |
Unit cost of Material Construction joints Interior structure in 2017 |
dollar/m^2 |
366 |
Unit_Mat_Embedded_steel_Substr |
Unit cost of Material Embedded steel Substructure (base mat) in 2017 |
dollar/m^3 |
367 |
Unit_Mat_Embedded_steel_Superstr |
Unit cost of Material Embedded steel Superstructure (shell) in 2017 |
dollar/m^3 |
368 |
Unit_Mat_Embedded_steel_Dome |
Unit cost of Material Embedded steel Superstructure (dome) in 2017 |
dollar/m^3 |
369 |
Unit_Mat_Embedded_steel_Interior |
Unit cost of Material Embedded steel Interior structure in 2017 |
dollar/m^3 |
370 |
Unit_Mat_Formwork_Substr |
Unit cost of Material Formwork Substructure (base mat) in 2017 |
dollar/m^2 |
371 |
Unit_Mat_Formwork_Superstr |
Unit cost of Material Formwork Superstructure (shell) in 2017 |
dollar/m^2 |
372 |
Unit_Mat_Formwork_Dome |
Unit cost of Material Formwork Superstructure (dome) in 2017 |
dollar/m^2 |
373 |
Unit_Mat_Formwork_Interior |
Unit cost of Material Formwork Interior structure in 2017 |
dollar/m^2 |
374 |
Unit_Mat_Maj_supp_embedments_Interior |
Unit cost of Material Major Support Embedments Interior structure in 2017 |
dollar/m^3 |
375 |
Unit_Mat_Reinforc_steel_Substr |
Unit cost of Material Reinforc steel Substructure (base mat) in 2017 |
dollar/m^3 |
376 |
Unit_Mat_Reinforc_steel_Superstr |
Unit cost of Material Reinforc steel Superstructure (shell) in 2017 |
dollar/m^3 |
377 |
Unit_Mat_Reinforc_steel_Dome |
Unit cost of Material Reinforc steel Superstructure (dome) in 2017 |
dollar/m^3 |
378 |
Unit_Mat_Reinforc_steel_Interior |
Unit cost of Material Reinforc steel Interior structure in 2017 |
dollar/m^3 |
379 |
Unit_Mat_Rubbing_surfaces_Superstr |
Unit cost of Material Rubbing surfaces Superstructure (shell) in 2017 |
dollar/m^2 |
380 |
Unit_Mat_Rubbing_surfaces_Dome |
Unit cost of Material Rubbing surfaces Superstructure (dome) in 2017 |
dollar/m^2 |
381 |
Unit_Mat_Rubbing_surfaces_Interior |
Unit cost of Material Rubbing surfaces Interior structure in 2017 |
dollar/m^2 |
382 |
Unit_Mat_Waterproofing_Substr |
Unit cost of Material Waterproofing Substructure (base mat) in 2017 |
dollar/m^2 |
383 |
Unit_Mat_Waterproofing_Superstr |
Unit cost of Material Waterproofing Superstructure (shell) in 2017 |
dollar/m^2 |
384 |
Unit_Mat_Waterproofing_Dome |
Unit cost of Material Waterproofing Superstructure (dome) in 2017 |
dollar/m^2 |
385 |
Unit_Mat_Welded_wire_fabric_Substr |
Unit cost of Material Welded wire fabric Substructure (base mat) in 2017 |
dollar/m^2 |
386 |
Unit_Mat_Lighting_Power |
Unit cost of Material Lighting Power in 2017 |
dollar/m^3 |
387 |
Unit_Mat_Plumb_drains |
Unit cost of Material Plumb drains in 2017 |
dollar/m^3 |
388 |
Unit_Mat_Special_HVAC |
Unit cost of Material Special HVAC in 2017 |
dollar/m^3 |
389 |
Unit_Mat_other |
Unit cost of Material other in 2017 |
dollar/m^3 |
390 |
Unit_Mat_Misc_steel_frames |
Unit cost of Material miscellaneous steel frames in 2017 |
dollar/m^3 |
391 |
Unit_Mat_React_cav_liner |
Unit cost of Material Reactor cavity liner plate in 2017 |
dollar/m^2 |
392 |
Unit_Mat_Struct_steel |
Unit cost of Material Struct steel in 2017 |
dollar/m^3 |
393 |
Unit_Mat_cont_liner |
Unit cost of Material Containment liner in 2017 |
dollar/m^2 |
394 |
Unit_Mat_fl_grate_handrail_stairs |
Unit cost of Material Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar/m^3 |
395 |
Unit_Mat_painting |
Unit cost of Material painting in 2017 |
dollar/m^2 |
396 |
Total_Labor_Cadweld_Substr |
Total cost of Labor Cadweld Substructure (base mat) in 2017 |
dollar |
397 |
Total_Labor_Cadweld_Superstr |
Total cost of Labor Cadweld Superstructure (shell) in 2017 |
dollar |
398 |
Total_Labor_Cadweld_Dome |
Total cost of Labor Cadweld Superstructure (dome) in 2017 |
dollar |
399 |
Total_Labor_Cadweld_Interior |
Total cost of Labor Cadweld Interior structure in 2017 |
dollar |
400 |
Total_Labor_Concrete_Substr |
Total cost of Labor Concrete Substructure (base mat) in 2017 |
dollar |
401 |
Total_Labor_Concrete_Superstr |
Total cost of Labor Concrete Superstructure (shell) in 2017 |
dollar |
402 |
Total_Labor_Concrete_Dome |
Total cost of Labor Concrete Superstructure (dome) in 2017 |
dollar |
403 |
Total_Labor_Concrete_Interior |
Total cost of Labor Concrete Interior structure in 2017 |
dollar |
404 |
Total_Labor_Constr_joints_Substr |
Total cost of Labor Construction joints Substructure (base mat) in 2017 |
dollar |
405 |
Total_Labor_Constr_joints_Superstr |
Total cost of Labor Construction joints Superstructure (shell) in 2017 |
dollar |
406 |
Total_Labor_Constr_joints_Dome |
Total cost of Labor Construction joints Superstructure (dome) in 2017 |
dollar |
407 |
Total_Labor_Constr_joints_Interior |
Total cost of Labor Construction joints Interior structure in 2017 |
dollar |
408 |
Total_Labor_Embedded_steel_Substr |
Total cost of Labor Embedded steel Substructure (base mat) in 2017 |
dollar |
409 |
Total_Labor_Embedded_steel_Superstr |
Total cost of Labor Embedded steel Superstructure (shell) in 2017 |
dollar |
410 |
Total_Labor_Embedded_steel_Dome |
Total cost of Labor Embedded steel Superstructure (dome) in 2017 |
dollar |
411 |
Total_Labor_Embedded_steel_Interior |
Total cost of Labor Embedded steel Interior structure in 2017 |
dollar |
412 |
Total_Labor_Formwork_Substr |
Total cost of Labor Formwork Substructure (base mat) in 2017 |
dollar |
413 |
Total_Labor_Formwork_Superstr |
Total cost of Labor Formwork Superstructure (shell) in 2017 |
dollar |
414 |
Total_Labor_Formwork_Dome |
Total cost of Labor Formwork Superstructure (dome) in 2017 |
dollar |
415 |
Total_Labor_Formwork_Interior |
Total cost of Labor Formwork Interior structure in 2017 |
dollar |
416 |
Total_Labor_Maj_supp_embedments_Interior |
Total cost of Labor Major Support Embedments Interior structure in 2017 |
dollar |
417 |
Total_Labor_Reinforc_steel_Substr |
Total cost of Labor Reinforc steel Substructure (base mat) in 2017 |
dollar |
418 |
Total_Labor_Reinforc_steel_Superstr |
Total cost of Labor Reinforc steel Superstructure (shell) in 2017 |
dollar |
419 |
Total_Labor_Reinforc_steel_Dome |
Total cost of Labor Reinforc steel Superstructure (dome) in 2017 |
dollar |
420 |
Total_Labor_Reinforc_steel_Interior |
Total cost of Labor Reinforc steel Interior structure in 2017 |
dollar |
421 |
Total_Labor_Rubbing_surfaces_Superstr |
Total cost of Labor Rubbing surfaces Superstructure (shell) in 2017 |
dollar |
422 |
Total_Labor_Rubbing_surfaces_Dome |
Total cost of Labor Rubbing surfaces Superstructure (dome) in 2017 |
dollar |
423 |
Total_Labor_Rubbing_surfaces_Interior |
Total cost of Labor Rubbing surfaces Interior structure in 2017 |
dollar |
424 |
Total_Labor_Waterproofing_Substr |
Total cost of Labor Waterproofing Substructure (base mat) in 2017 |
dollar |
425 |
Total_Labor_Waterproofing_Superstr |
Total cost of Labor Waterproofing Superstructure (shell) in 2017 |
dollar |
426 |
Total_Labor_Waterproofing_Dome |
Total cost of Labor Waterproofing Superstructure (dome) in 2017 |
dollar |
427 |
Total_Labor_Welded_wire_fabric_Substr |
Total cost of Labor Welded wire fabric Substructure (base mat) in 2017 |
dollar |
428 |
Total_Labor_Lighting_Power |
Total cost of Labor Lighting Power in 2017 |
dollar |
429 |
Total_Labor_Plumb_drains |
Total cost of Labor Plumb drains in 2017 |
dollar |
430 |
Total_Labor_Special_HVAC |
Total cost of Labor Special HVAC in 2017 |
dollar |
431 |
Total_Labor_other |
Total cost of Labor other in 2017 |
dollar |
432 |
Total_Labor_Misc_steel_frames |
Total cost of Labor miscellaneous steel frames in 2017 |
dollar |
433 |
Total_Labor_React_cav_liner |
Total cost of Labor Reactor cavity liner plate in 2017 |
dollar |
434 |
Total_Labor_Struct_steel |
Total cost of Labor Struct steel in 2017 |
dollar |
435 |
Total_Labor_cont_liner |
Total cost of Labor Containment liner in 2017 |
dollar |
436 |
Total_Labor_fl_grate_handrail_stairs |
Total cost of Labor Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar |
437 |
Total_Labor_painting |
Total cost of Labor painting in 2017 |
dollar |
438 |
Total_Mat_Cadweld_Substr |
Total cost of Material Cadweld Substructure (base mat) in 2017 |
dollar |
439 |
Total_Mat_Cadweld_Superstr |
Total cost of Material Cadweld Superstructure (shell) in 2017 |
dollar |
440 |
Total_Mat_Cadweld_Dome |
Total cost of Material Cadweld Superstructure (dome) in 2017 |
dollar |
441 |
Total_Mat_Cadweld_Interior |
Total cost of Material Cadweld Interior structure in 2017 |
dollar |
442 |
Total_Mat_Concrete_Substr |
Total cost of Material Concrete Substructure (base mat) in 2017 |
dollar |
443 |
Total_Mat_Concrete_Superstr |
Total cost of Material Concrete Superstructure (shell) in 2017 |
dollar |
444 |
Total_Mat_Concrete_Dome |
Total cost of Material Concrete Superstructure (dome) in 2017 |
dollar |
445 |
Total_Mat_Concrete_Interior |
Total cost of Material Concrete Interior structure in 2017 |
dollar |
446 |
Total_Mat_Constr_joints_Substr |
Total cost of Material Construction joints Substructure (base mat) in 2017 |
dollar |
447 |
Total_Mat_Constr_joints_Superstr |
Total cost of Material Construction joints Superstructure (shell) in 2017 |
dollar |
448 |
Total_Mat_Constr_joints_Dome |
Total cost of Material Construction joints Superstructure (dome) in 2017 |
dollar |
449 |
Total_Mat_Constr_joints_Interior |
Total cost of Material Construction joints Interior structure in 2017 |
dollar |
450 |
Total_Mat_Embedded_steel_Substr |
Total cost of Material Embedded steel Substructure (base mat) in 2017 |
dollar |
451 |
Total_Mat_Embedded_steel_Superstr |
Total cost of Material Embedded steel Superstructure (shell) in 2017 |
dollar |
452 |
Total_Mat_Embedded_steel_Dome |
Total cost of Material Embedded steel Superstructure (dome) in 2017 |
dollar |
453 |
Total_Mat_Embedded_steel_Interior |
Total cost of Material Embedded steel Interior structure in 2017 |
dollar |
454 |
Total_Mat_Formwork_Substr |
Total cost of Material Formwork Substructure (base mat) in 2017 |
dollar |
455 |
Total_Mat_Formwork_Superstr |
Total cost of Material Formwork Superstructure (shell) in 2017 |
dollar |
456 |
Total_Mat_Formwork_Dome |
Total cost of Material Formwork Superstructure (dome) in 2017 |
dollar |
457 |
Total_Mat_Formwork_Interior |
Total cost of Material Formwork Interior structure in 2017 |
dollar |
458 |
Total_Mat_Maj_supp_embedments_Interior |
Total cost of Material Major Support Embedments Interior structure in 2017 |
dollar |
459 |
Total_Mat_Reinforc_steel_Substr |
Total cost of Material Reinforc steel Substructure (base mat) in 2017 |
dollar |
460 |
Total_Mat_Reinforc_steel_Superstr |
Total cost of Material Reinforc steel Superstructure (shell) in 2017 |
dollar |
461 |
Total_Mat_Reinforc_steel_Dome |
Total cost of Material Reinforc steel Superstructure (dome) in 2017 |
dollar |
462 |
Total_Mat_Reinforc_steel_Interior |
Total cost of Material Reinforc steel Interior structure in 2017 |
dollar |
463 |
Total_Mat_Rubbing_surfaces_Superstr |
Total cost of Material Rubbing surfaces Superstructure (shell) in 2017 |
dollar |
464 |
Total_Mat_Rubbing_surfaces_Dome |
Total cost of Material Rubbing surfaces Superstructure (dome) in 2017 |
dollar |
465 |
Total_Mat_Rubbing_surfaces_Interior |
Total cost of Material Rubbing surfaces Interior structure in 2017 |
dollar |
466 |
Total_Mat_Waterproofing_Substr |
Total cost of Material Waterproofing Substructure (base mat) in 2017 |
dollar |
467 |
Total_Mat_Waterproofing_Superstr |
Total cost of Material Waterproofing Superstructure (shell) in 2017 |
dollar |
468 |
Total_Mat_Waterproofing_Dome |
Total cost of Material Waterproofing Superstructure (dome) in 2017 |
dollar |
469 |
Total_Mat_Welded_wire_fabric_Substr |
Total cost of Material Welded wire fabric Substructure (base mat) in 2017 |
dollar |
470 |
Total_Mat_Lighting_Power |
Total cost of Material Lighting Power in 2017 |
dollar |
471 |
Total_Mat_Plumb_drains |
Total cost of Material Plumb drains in 2017 |
dollar |
472 |
Total_Mat_Special_HVAC |
Total cost of Material Special HVAC in 2017 |
dollar |
473 |
Total_Mat_other |
Total cost of Material other in 2017 |
dollar |
474 |
Total_Mat_Misc_steel_frames |
Total cost of Material miscellaneous steel frames in 2017 |
dollar |
475 |
Total_Mat_React_cav_liner |
Total cost of Material Reactor cavity liner plate in 2017 |
dollar |
476 |
Total_Mat_Struct_steel |
Total cost of Material Struct steel in 2017 |
dollar |
477 |
Total_Mat_cont_liner |
Total cost of Material Containment liner in 2017 |
dollar |
478 |
Total_Mat_fl_grate_handrail_stairs |
Total cost of Material Floor grating (galvanized), Handrail, Stair treads in 2017 |
dollar |
479 |
Total_Mat_painting |
Total cost of Material painting in 2017 |
dollar |
480 |
Sum_Labor_Cadweld |
Total cost of Labor Cadweld |
dollar |
481 |
Sum_Labor_Concrete |
Total cost of Labor Concrete |
dollar |
482 |
Sum_Labor_Constr_joints |
Total cost of Labor Constr joints |
dollar |
483 |
Sum_Labor_Embedded_steel |
Total cost of Labor Embedded steel |
dollar |
484 |
Sum_Labor_Formwork |
Total cost of Labor Formwork |
dollar |
485 |
Sum_Labor_Maj_supp_embedments |
Total cost of Labor Maj supp embedments |
dollar |
486 |
Sum_Labor_Reinforc_steel |
Total cost of Labor Reinforc steel |
dollar |
487 |
Sum_Labor_Rubbing_surfaces |
Total cost of Labor Rubbing surfaces |
dollar |
488 |
Sum_Labor_Waterproofing |
Total cost of Labor Waterproofing |
dollar |
489 |
Sum_Labor_Welded_wire_fabric |
Total cost of Labor Welded wire fabric |
dollar |
490 |
Sum_Mat_Cadweld |
Total cost of Material Cadweld |
dollar |
491 |
Sum_Mat_Concrete |
Total cost of Material Concrete |
dollar |
492 |
Sum_Mat_Constr_joints |
Total cost of Material Constr joints |
dollar |
493 |
Sum_Mat_Embedded_steel |
Total cost of Material Embedded steel |
dollar |
494 |
Sum_Mat_Formwork |
Total cost of Material Formwork |
dollar |
495 |
Sum_Mat_Maj_supp_embedments |
Total cost of Material Maj supp embedments |
dollar |
496 |
Sum_Mat_Reinforc_steel |
Total cost of Material Reinforc steel |
dollar |
497 |
Sum_Mat_Rubbing_surfaces |
Total cost of Material Rubbing surfaces |
dollar |
498 |
Sum_Mat_Waterproofing |
Total cost of Material Waterproofing |
dollar |
499 |
Sum_Mat_Welded_wire_fabric |
Total cost of Material Welded wire fabric |
dollar |
500 |
Tot_Labor_concr |
Total cost of labor of containment construction |
dollar |
501 |
Tot_Labor_equipment |
Total cost of labor of containment equipments |
dollar |
502 |
Tot_Labor_others |
Total cost of labor of other non-concrete related items |
dollar |
503 |
Tot_Mat_concr |
Total cost of material of containment construction |
dollar |
504 |
Tot_Mat_equipment |
Total cost of material of containment equipments |
dollar |
505 |
Tot_Mat_others |
Total cost of material of other non-concrete related items |
dollar |
506 |
Tot_Labor_containment |
Total cost of labor of containment |
dollar |
507 |
Tot_Mat_containment |
Total cost of material of containment |
dollar |